Laserfiche WebLink
The Task Force wanted additional information and analysis done for a theater and <br /> boutique hotel, and generally supported options that would attract people Downtown to <br /> support restaurants. Additionally, the Task Force was reminded the land use options <br /> and policies in the specific plan were not dictated solely by the market analysis, and <br /> other desirable objectives (such as maintaining community character; the desire for a <br /> low-scale, commercial-centric Downtown; the desire for enhanced entertainment <br /> amenities or open space), may also be considered. <br /> Subsequent to the November 28, 2017 Task Force meeting and in preparation for this <br /> City Council meeting, EPS provided a high-level analysis of the preliminary Civic Center <br /> option (Attachment 7). Key findings from this analysis include: <br /> • While the Civic Center site is well positioned from a market perspective, <br /> successful development will likely require a creative public-private partnership <br /> given the substantial public amenities and infrastructure associated with the <br /> proposed land use concept; <br /> ® Residential uses will likely generate the highest development value for the Civic <br /> Center site given strong local and regional market support and limited new <br /> product offerings; <br /> e While not as valuable as stand-alone residential, office development is also likely <br /> to generate surplus value that could be used to cover a portion of project wide <br /> costs; <br /> e Given more moderate market demand and intensive parking requirements <br /> associated with retail, hotel, and/or entertainment (e.g., cinema) uses, these <br /> project elements are unlikely to advance the overall development feasibility and <br /> may in fact require additional public subsidy; and <br /> e The proposed development program for the Civic Center site would likely have a <br /> positive impact on the City's General Fund budget, with annual revenues from <br /> new property, sales and related taxes off-setting the on-going cost of providing <br /> municipal services (e.g., public safety and facility maintenance). <br /> PUBLIC NOTICE <br /> Notice of this meeting was sent to all property owners and tenants within the Downtown <br /> Specific Plan area. Public comments received after the November 28, 2017, Task Force <br /> meeting are enclosed with this report as Attachment 8. <br /> DISCUSSION <br /> Staff is providing an update to the City Council on the preferred streetscape options and <br /> revised land use plan for Civic Center, in advance of proceeding with technical analysis <br /> and the redlined plan. The next steps identified below are anticipated in the near future. <br /> NEXT STEPS <br /> The next steps in the Downtown Specific Plan Update process are scheduled to consist <br /> of the following: <br /> eTechnical analysis by City staff and consultants of the preferred land use option <br /> for the Civic Center. These studies will include: (1) traffic impact assessment; <br /> (2) civil engineering assessment; (3) fiscal impact analysis; (4) financial feasibility <br /> analysis. <br /> Page 5 of 6 <br />