Laserfiche WebLink
<br />all times during construction. This existing road shall be removed once <br />satisfactory access has be established. <br /> <br />140. The developer shall install subdrains at the back of sidewalk or back of curb along <br />all streets within the development. Said drain shall be connected to the street storm <br />drain system. <br /> <br />141. Unless otherwise approved by the Fire Marshall no housing construction shall <br />begin until such time as an acceptable emergency vehicle access has been <br />established, as defined by the Fire Marshall. This access shall be maintained at all <br />time until the public improvements are accepted. <br /> <br />142. The perimeter of all building foundations shall be designed with subdrains. Said <br />drains shall be connected to the street gutter or other means acceptable to the City <br />Engineer. <br /> <br />143. All roof leaders shall be connect connected to the street gutter or other means <br />acceptable <br />to the City Engineer. <br /> <br />144. There shall be individual sanitary sewer and water laterals to each dwelling unit. <br />There shall be a two way cleanout on the sanitary sewer lateral located at the back <br />of the PSE. <br /> <br />145. Prior to tentative map approval, the need for a geologic hazard abatement district <br />shall be determined to the satisfaction of the City Engineer. <br /> <br />PD991 KF .SAM/rke <br /> <br />{end} <br /> <br />Page 24 <br />