Laserfiche WebLink
<br />problems associated with this development to the satisfaction of the City Engineer. <br />The existing CMP storm drain pipes under Foothill Road shall be replaced with <br />RCP pipes. <br /> <br />134. The owners of the lots 3, 4, 6, and 7 shall be notified that they will have accept a <br />portion of the drainage from the uphill area as part of their individual lot drainage <br />plan. Specific reference to these requirements shall be made in the deed for each <br />lot. <br /> <br />135. The applicant shall improve Foothill Road across the project frontage to the <br />satisfaction of the City Engineer. These improvements shall essentially as shown <br />on the improvement /striping plan for Foothill Road. Except the bike lane shall be <br />maintained along the total westerly frontage and road shall transition southerly of <br />the project frontage. The applicant shall dedicate a 8 foot wide public service <br />easement behind the curb. There should be no driveway access to Foothill Road. <br />The final map shall reflect this condition. The developer shall determine the <br />structural section of existing west side of Foothill Road. If the existing street <br />section is not adequate for the anticipated traffic demand the street shall be <br />reconstructed. If the street section is adequate the street shall be overlayed with a <br />minimum of 2 inches of asphalt with fabric. The tentative map shall show these <br />improvements. <br /> <br />136. The developer shall be responsible for the undergrounding of the overhead utility <br />lines across the project Foothill Road frontage. The applicant may enter into a <br />reimbursement agreement with the City to recover some of the cost of the <br />under grounding from other benefiting properties when they develop their <br />properties. <br /> <br />137. All proposed V-Ditches shall be constructed of concrete and colored with an <br />earthtone color approved by the Planning Director. <br /> <br />138. The applicant shall obtain a drainage easement from EBRPD for the storm drain <br />discharge into the creek along the north side of the project. <br /> <br />139. The applicant shall obtain a quit claim deed from EBRPD for the existing access <br />easement across the northern side of the Lemoine property. Access easements over <br />the entire new northern private road shall be provided to the EBRPD. Access to <br />the existing homes on the Lemoine property and the EBRPD shall be maintained at <br /> <br />Page 23 <br />