My WebLink
|
Help
|
About
|
Sign Out
PC-99-65
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1999
>
PC-99-65
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:55 AM
Creation date
12/19/2003 4:46:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
9/8/1999
DOCUMENT NO
PC-99-65
DOCUMENT NAME
PUD-99-01
NOTES
MARDELL LLC
NOTES 3
12 RESIDENTIAL LOTS & 1 EXISTING UNIT C/2ND UNIT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />72. The developer shall comply with the recommendations of the geotechnical reports <br />prepared by Terrasearch Inc. dated "November 9, 1998", "January 22, 1999", and <br />"July 22, 1999" and the recommendations of the geotechnical peer reviewers, <br />Alan Kropp and Associates and William Lettis and Associates Inc., all incorpo- <br />rated herein by reference. If there are conflicting recommendations between that <br />of Terrasearch and the peer reviewers, the peer reviewers' recommendations shall <br />supersede the recommendations of the Terrasearch report. Similarly, if there are <br />conflicting recommendations in one Terrasearch report and another, the recom- <br />mendations of the later Terrasearch report shall supersede the earlier Terrasearch <br />report. <br /> <br />73. The developer shall arrange and pay for Terrasearch and Allan Kropp and Associ- <br />ates to inspect and approve all foundation, retaining, wall and drainage geotechni- <br />cal aspects of project construction. A consultant from Terrasearch and Allan <br />Kropp and Associates shall be present on site during grading and excavation op- <br />erations as recommended by Allan Kropp and Associates. The results of the in- <br />spections and the as-built conditions of the project shall be certified in writing by <br />the geotechnical consultant for Terrasearch and Allan Kropp and Associates for <br />conformance to the approved plans and geotechnical report and submitted to the <br />City Engineer and Director of Building Inspection for review and approval prior to <br />occupancy. <br /> <br />74. Prior to Tentative Map approval, the developer shall submit a detail of the pro- <br />posed street lighting, including photometries, for the project. Design and location <br />of the street lights shall be subject to the review and approval of the Planning Di- <br />rector and City Engineer. The street lighting for the development shall be designed <br />and located so as to minimize visibility from the valley floor to the greatest extent <br />possible and shall be designed to have a country feeling, subject to the review and <br />approval of the City Engineer and Planning Commission. Approval for the num- <br />ber, location, and type of electroliers shall be subject to the review and approval of <br />the City Engineer. <br /> <br />75. Lots above elevation 390 shall have individual hydromatic booster pumps for their <br />water systems. Where feasible, the pumps shall be located in the garage of the <br />dwelling unit. <br /> <br />76. The storm water runoff from each of the lots shall be directed to the public street <br />or other approved storm drain collection system unless otherwise approved by the <br />Building Official and City Engineer. <br /> <br />Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.