My WebLink
|
Help
|
About
|
Sign Out
PC-99-59
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1999
>
PC-99-59
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:55 AM
Creation date
12/19/2003 4:04:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/25/1999
DOCUMENT NO
PC-99-59
DOCUMENT NAME
Z-99-79
NOTES
PANATTONI DEVT CO
NOTES 3
3 BLDGS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />33. A sanitary sewer sampling manhole shall be provided on each of the sanitary sewer lateral <br />from each building. <br /> <br />34. All retaining walls higher than four feet (4' 0") from the top of the wall to the bottom of <br />the footway shall be constructed of reinforced concrete or shall be an approved crib wall <br />type. Calculations signed by a registered civil engineer shall accompany the wall plans. <br /> <br />35. The project developer shall submit two (2) copies of the site soils report to the Director of <br />Building Inspection for third party peer review and shall pay for such review at the time <br />specified by the Director, but in all cases before the issuance of a grading permit. <br /> <br />36. The soils engineer shall certify the pad compactions of all lots containing fill to the <br />satisfaction of the Director of Building Inspection prior to the issuance of building <br />permits. <br /> <br />37. Building and situs plans are to be submitted to the Building Department on computer disk <br />in a format approved by the Director. Digitized information shall be submitted before <br />requesting a final inspection and should reflect as-built situs and architectural information <br />as approved by the Director. <br /> <br />Construction Requirements: <br /> <br />38. All site improvements and construction activities shall be limited to the hours of8:00 a.m. <br />to 8:00 p.m., Monday through Saturday. All construction equipment must meet <br />Department of Motor Vehicles (DMV) noise standards and shall be equipped with <br />muffling devices. <br /> <br />39. At no time shall campers, trailers, motor homes, or any other vehicle be used as living or <br />sleeping quarters on the construction site. All such vehicles shall be removed from the <br />site at the end of each work day. <br /> <br />40. If archeological materials are uncovered during grading, trenching, or other on-site <br />excavation, all work on site shall be stopped and the City immediately notified. The <br />county coroner and the Native American Heritage Commission shall also be notified and <br />procedures followed as required in Appendix "K" of the California Environmental <br />Quality Act (CEQA). A similar note shall appear on the improvement plans. <br /> <br />41. Portable toilets used during construction shall be emptied on a regular basis as necessary <br />to prevent odor. <br /> <br />2-99-079, Final Conditions of Approval <br />Kevin BestlPanattoni Development Company <br /> <br />August 25. 1999 <br />Page 7 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.