Laserfiche WebLink
<br />Resolution No. PC-99-41 <br /> <br />Page 18 <br /> <br />111. The developer shall determine the structural section of existing Alisal Street. If the <br />existing street section is not adequate for the anticipated traffic demand the street shall be <br />reconstructed. If the street section is adequate, the street shall be overlayed with a <br />minimum of 1 1/2 inches of asphalt with fabric. <br /> <br />112. All new utility services shall be installed underground. <br /> <br />113. The design of the bridge crossing for the Bypass Road north of Lots 8 and 9 shall be <br />shown in conjunction with the tentative map. The exterior of the bridge shall incorporate <br />rural design elements. <br /> <br />{end} <br />