My WebLink
|
Help
|
About
|
Sign Out
PC-99-32
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1999
>
PC-99-32
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:32:53 AM
Creation date
12/19/2003 9:31:15 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
4/14/1999
DOCUMENT NO
PC-99-32
DOCUMENT NAME
PUD-81-30-79D
NOTES
PRIDENTIAL INS CO OF AMERICA
NOTES 3
5 OFFICE BLDGS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-99-32 <br />Page 13 <br />ENGINEERING DEPARTMENT CONDITIONS <br />Grading and Drainage <br /> <br />64. The developer shall submit a final grading and drainage plan prepared by a <br />licensed civil engineer depicting all final grades and on-site drainage control <br />measures, including concrete-lined V-ditches, to protect all cut and fill slopes from <br />surface water overflow. This plan shall be subject to the review and approval of <br />the City Engineer and/or the Director of Building Inspection prior to the issuance <br />of any building permits. <br /> <br />65. The developer shall submit an erosion and sedimentation control plan or procedure <br />as part of the final grading and/or improvement plans. The applicant is responsible <br />for ensuring that the contractor is aware of and implements such measures. No <br />grading shall occur between October 15 and April 15 unless approved erosion <br />control/storm water quality measures are in place, subject to the approval of the <br />City Engineer/ Director of Building Inspection. Such measures shall be <br />maintained until such time as permanent landscaping is in place. All cut and fill <br />slopes shall be revegetated and stabilized as soon as possible after completion of <br />grading, but in no case later than October 15th. Hydroseeding shall be <br />accomplished before September 15 and irrigated with a temporary irrigation <br />system to ensure that the grasses are established before October 15. <br /> <br />66. The developer shall submit a refundable cash bond for hazard and erosion control <br />prior to issuance of an Engineering or Building Department permit. The amount of <br />this bond will be determined by the City Engineer. <br /> <br />67. The developer shall submit a dust control plan or procedure as part of the <br />improvement plans, subject to the review and approval of the City Engineer. <br /> <br />68. Storm drainage swales, gutters, inlets, outfalls, and channels not within the area of <br />a dedicated public street or public service easement approved by the City Engineer <br />shall be privately maintained by the property owners or through an association <br />approved by the City. <br /> <br />69. Approval ofthe storm drainage system shall be subject to the review and approval <br />of the City Engineer and Zone 7, as applicable, that the system is adequate, <br />connects to an approved point of discharge, meets any and all applicable <br />requirements of the Alameda County Flood Control District - Zone 7, meets any <br />and all applicable requirements of the Federal Emergency Management Flood <br />Hazard Program, the California Department ofFish and Game, and meets the <br />immediate and long-range requirements ofthis development and all upstream areas <br />intended to be drained through this development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.