Laserfiche WebLink
<br />October 15 and April 15 unless approved erosion control/storm water quality <br />measures are in place, subject to the approval of the City Engineer/ Director of <br />Building Inspection. Such measures shall be maintained until such time as <br />permanent landscaping is place. <br /> <br />104. The applicant shall label all on-site storm drain inlets with the wording, "No <br />Dumping -- Drains to Bay" using City-approved methods and materials. On-site <br />storm drain facilities shall be cleaned a minimum of twice a year as follows: <br />immediately prior to October 15 and once in January. Additional cleaning may be <br />required iffound necessary by the City Engineer/Director of Building Inspection. <br /> <br />105. The applicant shall submit a construction Best Management Practices (BMP's) <br />program for review and approval by the Planning Director prior to issuance of <br />building and/or grading permits. These BMP's shall be implemented by the <br />general contractor and all subcontractors and suppliers of materials and equipment. <br />Construction site cleanup and control of construction debris shall also be <br />addressed. Failure to comply with the approved construction BMP may result in <br />the issuance of correction notices, citations, or a stop work order. The applicant is <br />responsible for implementing the following measures during all construction <br />phases of the project: <br /> <br />a. Gather all construction debris on a regular basis and place it in a dumpster <br />or other container which is emptied or removed on a weekly basis. When <br />appropriate, use tarps on the ground to collect fallen debris or splatters that could <br />contribute to storm water runoff pollution. <br /> <br />b. Remove all dirt, gravel, rubbish, refuse, and green waste from the street <br />pavement and storm drains adjoining the site. Limit construction access routes <br />onto the site and place gravel on them. Do not drive vehicles and equipment off <br />paved or graveled areas during wet weather. Broom sweep the street pavement <br />adjoining the project site on a daily basis. Scrape caked-on mud and dirt from <br />these areas before sweeping. <br /> <br />c. Install filter materials (such as sandbags, filter fabric, etc.) at the storm <br />drain inlet nearest the downstream side of the project site in order to retain any <br />debris or dirt flowing in the storm drain system. Maintain and!or replace filter <br />materials to ensure effectiveness and to prevent street flooding. <br /> <br />d. Create a contained and covered area on the site for the storage of bags, <br />cement, paints, oils, fertilizers, pesticides, or other materials used on the site that <br /> <br />PUD-96-14 <br /> <br />Page 62 <br />