Laserfiche WebLink
1) Forms, excavation, and steel inspection~ <br /> 2) Rough plumbing, including test on lines <br />at 30 p.s.i. <br /> <br /> 3) Electrical bonding of the pool equipment <br /> <br />and reinforcement as required; <br /> 4) Electrical conduit and wiring installation <br /> <br />prior to covering and including the change of electric service <br />if required; <br /> <br /> 5) Electrical and plumbing final inspection <br />and approval; <br /> <br /> 6) Equipment foundation; <br /> 7) Approved fence and gate completely <br /> <br />stalled with approved closers and latches, if required~ <br /> <br /> 8) Gas inspections, if required; <br /> <br /> 9) Enclosure for heaters, boilers, and <br />electrical equipment, if required; and <br /> <br /> 10) All flues in place and complete. <br /> <br /> When in the opinion of the administrative authority <br />because of particularly unusual conditions including but not <br />limited to soil, topography, proximity of buildings or <br />untested construction techniques, it appears that continuous <br />inspection during the placing of the structure is desirable, <br />the administrative authority shall have the right to require <br />such continuous inspection by a responsible registered <br />engineer who shall thereafter submit a letter certifying as to <br />the proper execution of the work. <br /> <br /> (d) Prefinal inspection required. It shall be <br />required that all swimming pools shall be in a completed state, <br />having received all inspections and approvals as required, <br />prior to plastering and filling the pool with water. <br /> <br /> -6- <br /> <br /> <br />