TABLE 2 (continued) <br /> SUMMARY OF SIGNIFICANT AND UNAVOIDABLE TRANSPORTATION AND TRAFFIC IMPACTS <br /> Impact Location Affected Mitigation Physical Level of Impact After Mitigation <br /> Measure Improvement <br /> Impact 4.D-2: Commerce Drive at Johnson Drive Intersection.The addition of <br /> Development facilitated vehicle trips generated by Phase I of the EDZ during the PM peak hour Same as above for <br /> by the proposed EDZ would worsen the side street movement at this intersection to LOS F; 4.D-1a Mitigation Measure Less than Significant <br /> would affect levels of this condition would be further worsened with full EDZ buildout 4.D-1 a <br /> service at the local study conditions.(Impact 4.D-2a) <br /> intersections under Near- Johnson Drive at Owens Drive(North)Intersection.The addition of <br /> term plus Project vehicle trips generated by Phase I of the EDZ during the PM peak hour Same as above for <br /> conditions. would degrade the service level at this intersection from LOS C to LOS 4.D-1 b Mitigation Measure Less than Significant <br /> E,and during the Saturday peak hour would degrade the service level 4.D-lb <br /> at this intersection from LOS C to LOS F.Conditions would be <br /> exacerbated with full EDZ buildout conditions.(Impact 4.D-2b) <br /> Johnson Drive at Stoneridge Drive Intersection.The addition of Same as above for <br /> vehicle trips generated by Phase I and full buildout of the EDZ during 4.D-1c Mitigation Measure Less than Significant <br /> the PM peak hour would worsen conditions at this intersection from 4.D-lc <br /> LOS D to LOS E. (Impact 4.D-2c) <br /> Stoneridge Drive(Queue Spillback).The addition of vehicle trips Significant and Unavoidable due to <br /> generated by Phase I and full buildout of the EDZ would result in substantial uncertainty about Caltrans <br /> vehicle queue spillback from Stoneridge Drive onto adjacent Same as above for approval for 1-680 improvement(#4 in <br /> intersections and the freeway mainline. (Impact 4.D-2d): 4.D-1c; Mitigation Mitigation Measure 4.D-1d)and <br /> 3. Vehicle queue spillback from the 1-680 northbound off-ramp 4.D-1d Measures 4.D-lc interdependency between#1,#2,#3, <br /> and southbound off-ramp onto the freeway mainline. and 4.D-1d and#4. <br /> 4. Vehicle queue spillback impeding through traffic on Stoneridge Funding:City's TIF <br /> Drive and blocking access to driveways along Johnson Drive. <br /> Johnson Drive and Park and Ride Lot Intersection.The addition <br /> of vehicle trips generated by Phase I of the EDZ and other near-term Same as above for Significant and Unavoidable <br /> projects during the PM peak hour would worsen the side street 4.D-1c Mitigation Measure <br /> movement at this intersection to LOS E; under full buildout 4.D-lc Funding:City's TIF <br /> conditions,this condition would worsen to LOS F. (Impact 4.D-2e) <br /> 44 <br />