My WebLink
|
Help
|
About
|
Sign Out
RES 17976
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2010-2019
>
2017
>
RES 17976
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2017 9:31:19 AM
Creation date
11/13/2017 4:40:06 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
11/7/2017
DESTRUCT DATE
PERMANENT
DOCUMENT NO
17976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • Require commute based trip reduction programs for all businesses of more <br /> than 20 on-site employees that may include transit subsidies,parking cash out <br /> incentives, and carpool parking preferences; <br /> • Provide preferred parking spaces and recharging stations for electric vehicles; <br /> • Require businesses to provide bicycle facility amenities such as showers and <br /> lockers; <br /> • Require electrical hook-ups for diesel trucks at loading docks; <br /> • Require any new backup diesel generators to meet CARB's Tier 4 emission <br /> standards; <br /> • Prohibit all vehicles including commercial motor vehicles with gross <br /> vehicular weight ratings of less than 10,000 pounds from idling for more than <br /> 2 minutes; and <br /> • Require truck fleets based in the area of the proposed EDZ to meet CARB's <br /> highest engine tier available at the time the building permits are issued. <br /> Site(s) affected: All sites within the proposed Zone. <br /> Implementation of Mitigation Measure 4.B-2 would not reduce the impact to less <br /> than significant as anticipated buildout within the area of the proposed Zone would <br /> result in emissions of NOx and PM10 that would remain above the BAAQMD <br /> significance thresholds, even with implementation of mitigation. <br /> (Draft SEIR,pp. 4.B-18 to 4.B-21.) <br /> Impact 4.B-3 <br /> Operation of uses within the area of the proposed Zone would conflict with or <br /> obstruct implementation of the applicable air quality plan. <br /> The SEIR evaluates the impacts on air quality that would result from construction <br /> and operation activities that would take place within the area of the proposed Zone. The <br /> assessment includes the potential for the proposed Zone to violate an air quality standard or <br /> contribute substantially to an existing or projected air quality violation, to result in a cumulatively <br /> considerable net increase of any criteria pollutant for which the region is in non-attainment, or to <br /> expose sensitive receptors to substantial pollutant concentrations, including odors. Air quality <br /> effects related to the proposed Zone are evaluated against State and federal ambient air quality <br /> standards, as well as the standards established by the BAAQMD. <br /> Significance Before Mitigation: Significant <br /> Significance After Mitigation: Significant and Unavoidable <br /> Finding: Changes have been incorporated into the proposed Zone that would <br /> substantially lessen this impact, however, the changes would not reduce this impact <br /> 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.