Laserfiche WebLink
a list of hazardous materials sites compiled pursuant to Government Code§65962.5 and, as a <br /> result, create a significant hazard to the public or the environment. <br /> The SEIR evaluates the potential for development within the proposed Zone to emit <br /> hazardous emissions or handle hazardous or acutely hazardous materials, substances, or waste <br /> within one-quarter mile of an existing or proposed school, as well as the impacts related to the <br /> potential for sites proposed for development within the proposed Zone to be included on a list of <br /> hazardous materials sites compiled pursuant to Government Code §65962.5. <br /> Significance Before Mitigation: Significant <br /> Significance After Mitigation: Less than Significant <br /> Finding: Changes have been incorporated into the proposed Zone that would avoid <br /> the significant environmental effect as identified in the SEIR. Mitigation Measures <br /> 4.E-7 and 4.E-8,which are incorporated into the proposed Zone, will reduce the <br /> significant environmental impact to a less-than-significant level. <br /> Facts in Support of Finding: The following facts and mitigation measures indicate <br /> that the impact will be reduced to less than significant. <br /> 1. Development of sites known to be formerly contaminated by hazardous <br /> materials or wastes would occur within the proposed Zone, and remaining <br /> and/or previously unidentified contamination may be present on or below the <br /> ground surface within the area of the proposed Zone.Encountering <br /> contaminated soil, surface water, or groundwater without taking proper <br /> precautions during site remediation within the proposed Zone could result in <br /> the exposure of construction workers or others to hazardous materials and <br /> consequently result in associated significant adverse human health and <br /> environmental impacts. <br /> 2. Implementation of Mitigation Measures 4.E-7 and 4.E-8,which are listed <br /> above under Impact 4.E-5b, and set forth in Table 6-1 of the Final SEIR and <br /> listed in the MI RP,will ensure that Impact 4.E-5 would be reduced to a less- <br /> than-significant level and are hereby incorporated by reference. <br /> Site(s) affected: All sites within the proposed Zone. <br /> (Draft SEIR, pp. 4.E-27 to 4.E-28.) <br /> 7. Public Services and Utilities <br /> Impact 4.E-9e <br /> Development facilitated by the proposed Zone could potentially require new or <br /> expanded water supply resources or entitlements. <br /> The SEIR evaluates the impact of the proposed Zone related to the need for new or <br /> expanded water supply resources or entitlements. <br /> Significance Before Mitigation: Significant <br /> 36 <br />