Laserfiche WebLink
<br />Resolution No. PC-98-22 <br />Page 6 <br /> <br />21. All building and/or structural plans must comply with all codes and ordinances in effect <br />before the Building Department will issue permits. <br /> <br />22. The house shall be constructed to meet Title 24 State energy requirements. <br /> <br />23. The applicant shall include erosion control measures on the final grading plan. The <br />applicant is responsible for ensuring that the contractor is aware of such measures. All cut and fill <br />slopes shall be revegetated and/or stabilized as soon as possible after completion of grading, or by <br />October 15, whichever occurs first. If permanent landscaping is not in place by October 15, no <br />grading shall occur unless approved erosion control measures are to the satisfaction of the Building <br />Department. Such measures shall be maintained by the owner until such time as permanent <br />landscaping is established. <br /> <br />24. No construction materials shall be stored within public rights-of-way. <br /> <br />25. If the rim elevation of the upstream public sanitary sewer is at an elevation higher than the <br />lowest portion of the building pad, a back-flow prevention device (check valve) shall be installed <br />on the lateral between the house and public sanitary sewer line. <br /> <br />26. Portable toilets used during construction shall be kept as far as possible from existing <br />residences and shall be emptied on a regular basis as necessary to prevent odor. <br /> <br />27. The applicant shall submit a pad elevation certification prepared by a licensed land surveyor <br />or registered civil engineer, to the Chief Building Official and Planning Director, certifying that the <br />pad and building locations are per approved plans, prior to receiving a foundation inspection for the <br />structure. <br /> <br />28. Dust and mud shall be contained within the boundaries of the property during times of <br />construction. <br /> <br />FIRE AND POLICE: <br /> <br />29. The home shall be constructed with Class A fIre retardant roofing material to the <br />satisfaction of the Fire Marshall. The applicant is responsible for the relocation of the emergency <br />vehicle access gate to the satisfaction of the Fire Marshall. The gate shall be installed to the <br />satisfaction of the Fire Marshall prior to occupancy. <br /> <br />30. The home shall be equipped with an automatic residential fire suppressIOn system if <br />required by the Fire Marshall. <br />