3. Implementation of Mitigation Measures 4.0 -la and 4.E-1 set forth in Table <br />6-1 of the Final SEIR and listed in the MMRP will ensure that Impact 4.E- <br />1 a would be reduced to a less -than -significant level and are hereby <br />incorporated by reference and described below. <br />(2012 SEIR) Modified Mitigation Measure 4.C -la: Pre -construction Breeding Bird <br />Surveys. The City shall ensure that prior to development of all potential sites for <br />rezoning (Sites 1-4, 6-11, 13, 14, and 16-21) and each phase of project activities <br />that have the potential to result in impacts on breeding birds (e.g., tree removal or <br />demolition of buildings or bridges), the project applicant shall take the following <br />steps to avoid direct losses of nests, eggs, and nestlings and indirect impacts to <br />avian breeding success: <br />o If grading or construction activities occur only during the non -breeding <br />season, between August 31 and February 1, no surveys will be required. <br />o Pruning and removal of trees and other landscaped vegetation, including <br />grading of grasslands, should occur whenever feasible, outside the breeding <br />season (February 1 through August 31). <br />o During the breeding bird season (February 1 through August 31) a qualified <br />biologist will survey project sites for nesting raptors and passerine birds not <br />more than 14 days prior to any ground -disturbing activity or vegetation <br />removal. Surveys will include all line -of -sight trees within 500 feet (for <br />raptors) and all vegetation within 250 feet for all other species. <br />o Based on the results of the surveys, avoidance procedures will be adopted, if <br />necessary, on a case-by-case basis. These may include construction buffer <br />areas (up to several hundred feet in the case of raptors) or seasonal <br />avoidance. <br />o Bird nests initiated during construction are presumed to be unaffected by <br />project activities, and no buffer would be necessary except to avoid direct <br />destruction of a nest or mortality of nestlings. <br />o If pre -construction surveys indicate that nests are inactive or potential <br />habitat is unoccupied during the construction period, no further mitigation is <br />required if work is initiated within 14 days of the survey. Trees and shrubs <br />that have been determined to be unoccupied by nesting or other special - <br />status birds may be pruned or removed within 14 days of the pre - <br />construction survey. Should activities be delayed beyond 14 days, pre - <br />construction surveys shall be repeated prior to the start of work. <br />Site(s) affected: All sites within the proposed Zone. <br />Mitigation Measure 4.E-1: Pre -Construction Bat Surveys. Conditions of approval <br />for building and grading permits issued for demolition and construction on sites <br />within the EDZ area shall include a requirement for pre -construction special -status <br />bat surveys when large trees constituting suitable habitat for roosting bats (e.g. <br />trees with cavities or trees with bark that could be used for roosting such as <br />eucalyptus and redwood) are to be removed or underutilized or vacant buildings are <br />to be demolished. <br />27 <br />