My WebLink
|
Help
|
About
|
Sign Out
SPECIAL MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
091817
>
SPECIAL MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2017 3:28:02 PM
Creation date
9/14/2017 3:20:50 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/18/2017
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NO CoA" - IMMURE 4.114 <br />Figure 6 <br />410. <br />r <br />JOHNSON DR <br />aRe*.4tt <br />RTE 880 <br />COST ESTIMATES FOR TRANSPORTATION MITIGATION MEASURES <br />The estimated cost of the transportation mitigations described above will total <br />approximately $21.5 million, including design, construction and right-of-way acquisition. <br />The cost estimation for these mitigations identified in the DSEIR does not include the <br />Tri -Valley Transportation Fee payment, which is necessary to mitigate the impact to 1-680. <br />While the estimates contain costs for right-of-way acquisition, these estimates will need to <br />be refined once detailed plans for the transportation improvements are identified. For a <br />detailed itemization of the costs for design, roadway construction, structure/bridge <br />construction, and right-of—way acquisition, please refer to Attachment 1 of this report. <br />Commerce Dr at Johnson Signal <br />Johnson Dr at Owens Dr (North) Signal <br />Johnson Dr at Stoneridge Dr Intersection <br />Stoneridge Dr and I-680 onramp" <br />Johnson Drive widening <br />Design/Admin <br />Roadway <br />Structure <br />Right of Way <br />TOTAL <br />$ 330,000 <br />$ 1,210,000 <br />$ - <br />$ 210,000 <br />S 1,750,000 <br />$ 140,000 <br />$ 490,000 <br />$ - <br />$ - <br />$ 630,000 <br />$ 1,180,000 <br />$ 4,340,000 <br />$ - <br />$ 640,000 <br />S 6,160,000 <br />5 1,480,000 <br />5 4,100,000 <br />5 1,350,000 <br />$ 180,000 <br />5 7,110,000 <br />$ 1,100,000 <br />$ 4,070,000 <br />$ - <br />$ 650,000 <br />5 5,820,000 <br />Grand total <br />$ 21,470,000 <br />-2009 TIF estimated 56.3 million project cost - revised estimate is 57.11 million <br />As mentioned above, of these five projects, only the Stoneridge Drive and 1-680 onramp <br />project is identified in the City's TIF. The Stoneridge Drive overcrossing improvements <br />were identified in the 2009 TIF update and the project was estimated to cost $6.4 million <br />(shown in the table above with the revised estimated cost of $7.11 million). <br />Page 8 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.