My WebLink
|
Help
|
About
|
Sign Out
16
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
090517
>
16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2017 3:16:42 PM
Creation date
8/30/2017 1:04:16 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/5/2017
DESTRUCT DATE
15Y
DOCUMENT NO
16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF <br /> LEL 1 6 <br /> °°' "'°' CITY COUNCIL AGENDA REPORT <br /> LEASANTON© <br /> September 5, 2017 <br /> Community Development <br /> Traffic Engineering Division <br /> TITLE: APPROVE THE JUNIPERO STREET/INDEPENDENCE DRIVE TRAFFIC <br /> CALMING PLAN <br /> SUMMARY <br /> City staff has been working with the residents of the Junipero Street/Independence <br /> Drive neighborhood to develop solutions to address their traffic concerns. The City and <br /> the residents have developed a comprehensive plan that includes the following traffic <br /> calming elements: installation of four speed lumps, crosswalks, crosswalk signs and a <br /> radar speed sign. The residents have collected the required signatures to show that a <br /> strong majority (67%) of the residents support the plan. <br /> RECOMMENDATION <br /> Approve the Junipero Street/Independence Drive Traffic Calming Plan. <br /> FINANCIAL STATEMENT <br /> The estimated cost to construct the Junipero Street/Independence Drive Traffic Calming <br /> Plan is $25,000. Funds are available in the Junipero and Independence Traffic Calming <br /> Devices Capital Improvement Program project (CIP No. 17557). <br /> The physical devices that will be installed on Junipero Street/Independence Drive will <br /> require minimal maintenance, and the maintenance cost will be paid through the Street <br /> Division's Road Maintenance Program and the City's Traffic Signal Maintenance <br /> Program. The speed lumps will require advanced warning signs and pavement <br /> markings. The radar speed signs will require routine maintenance which is covered in <br /> the Traffic Signal Maintenance Contract. The proposed crosswalks will require the <br /> installation of warning signs and pavement markings. The proposed striping and <br /> pavement legends will need to be refreshed as needed to ensure visibility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.