My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
090517
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2017 3:56:08 PM
Creation date
8/30/2017 1:03:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/5/2017
DESTRUCT DATE
15Y
DOCUMENT NO
07
Document Relationships
07 ATTACHMENT 2
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\090517
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
qualified archaeological consultant having expertise in California prehistoric <br /> archaeology. The archaeological consultant shall determine if planned <br /> development could potentially impact important archaeological resources and <br /> shall then design an appropriate archaeological monitoring program. Upon <br /> completing the archaeological monitoring program, the archaeological consultant <br /> shall submit a written report of findings first and directly to the Director of <br /> Community Development. At a minimum, the archaeological monitoring program <br /> shall include the following: <br /> a. An archaeological monitor shall be on site during native soil disturbing <br /> activities. <br /> b. The archaeological consultant shall advise all project contractors to be on <br /> the alert for evidence of expected resources, and know how to identify the <br /> evidence of the expected resources, and the appropriate protocol in the <br /> event of discovering an archaeological resource. <br /> c. The archaeological monitor shall be present on the Staples Ranch site until <br /> the Director of Community Development, in consultation with the <br /> archaeological consultant, determines that project construction activities <br /> could have no effects on significant archaeological resources. <br /> d. The archaeological monitor shall record and be authorized to collect soil <br /> samples and artifactual/ecofactual material as warranted for analysis. <br /> e. If an intact archaeological deposit were to be encountered, all soil disturbing <br /> activities in the vicinity of the deposit shall cease. The City shall empower <br /> the archaeological monitor to temporarily redirect <br /> demolition/excavation/construction crews and heavy equipment until the <br /> resource is evaluated. The archaeological consultant shall immediately <br /> notify the Director of the Community Development of the encountered <br /> resources. <br /> f. Should archaeological resources be encountered during construction, the <br /> project developer shall consult with City and tribal representatives to <br /> determine the appropriate disposition of findings. Mitigation measures shall <br /> include one of the three alternatives below: <br /> i. In-Situ Preservation: The project developer shall preserve artifacts <br /> and resources as found and shall apply suitable open space, <br /> capping, or monumentation to the site. The project developer shall <br /> alter development plans to accommodate this alternative, as <br /> necessary. <br /> ii. Excavation/Recovery: The archaeological consultant shall excavate <br /> the site, evaluate the site for historical references, recover artifacts as <br /> appropriate, and cover the site to preserve remaining artifacts. The <br /> project developer shall maintain sufficient buffering between <br /> development subsurface construction and the location of resources. <br /> iii. Excavation/Removal: The archaeological consultant shall excavate <br /> and recover the cultural resources as described above and remove <br /> artifacts as necessary. However, due to the depth of development <br /> excavation, the site would be permanently disturbed. <br /> If the City requires data recovery, the archaeological consultant shall first prepare <br /> an Archaeological Data Recovery Plan that s/he shall submit to the Director of <br /> Community Development for review and approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.