My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
090517
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2017 3:56:08 PM
Creation date
8/30/2017 1:03:03 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/5/2017
DESTRUCT DATE
15Y
DOCUMENT NO
07
Document Relationships
07 ATTACHMENT 2
(Attachment)
Path:
\CITY CLERK\AGENDA PACKETS\2017\090517
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
construction hours. The Director of Community Development may allow <br /> earlier "start times" for specific construction activities (e.g., concrete <br /> foundation/floor pouring), if it can be demonstrated to the satisfaction of the <br /> Director of Community Development that the construction and construction <br /> traffic noise will not affect nearby residents. <br /> d. All construction equipment must meet Department of Motor Vehicle (DMV) <br /> noise standards and shall be equipped with muffling devices. <br /> e. Prior to construction, the applicant shall post on the site the allowable hours <br /> of construction activity. <br /> f. The property owner shall designate a noise disturbance coordinator who will <br /> be responsible for responding to complaints about noise during <br /> construction. The telephone number of the noise disturbance coordinator <br /> shall be conspicuously posted at the construction site and shall be provided <br /> to the Director of Community Development. <br /> g. Additional best management practices may be required by the Building and <br /> Safety Division and/or City Engineer. All additional best management <br /> practices shall be reviewed and approved by the Building and Safety <br /> Division and/or City Engineer, prior to implementation. <br /> 26. In accordance with measure TR-12.1, prior to the issuance of final improvement <br /> plans or grading permits, the project developer shall develop and provide a <br /> construction access plan to be reviewed and approved by the City Engineer. <br /> This plan will include, at a minimum, the following construction traffic <br /> management strategies for each phase of development: <br /> a. Using El Charro Road for construction related access for all phases of <br /> development, to the maximum extent feasible, rather than Stoneridge Drive. <br /> b. A set of comprehensive traffic control measures, including the scheduling of <br /> major truck trips and deliveries to avoid peak traffic hours, detour signs and <br /> flag persons if required, lane closure procedures, signs, cones for drivers, <br /> and designated construction access routes. In addition, the information will <br /> include a construction staging plan for any public right of way used of each <br /> phase of the proposed project. <br /> c. Provisions of parking management and spaces for all construction workers <br /> for each phase of construction. <br /> d. Notification procedures for adjacent property owners regarding when major <br /> deliveries, detours, and lane closures will occur. <br /> e. The location of construction staging areas for materials, equipment and <br /> vehicles. <br /> f. The identification of haul routes for the movement of construction vehicles <br /> that would minimize impacts on vehicular traffic, circulation, and safety; and <br /> a provision for monitoring surface streets used for haul routes so that any <br /> damage and debris attributable to the haul tracks can be identified and <br /> corrected by the project developers. <br /> g. A process for responding to, and tracking complaints pertaining to <br /> construction activity, including identification of an on-site complaint <br /> manager. <br /> 27. In accordance with measure CR-1, prior to the issuance of a grading permit or <br /> building permit for the project, the project developer shall retain the services of a <br />
The URL can be used to link to this page
Your browser does not support the video tag.