My WebLink
|
Help
|
About
|
Sign Out
AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
082917
>
AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2017 5:07:37 PM
Creation date
8/21/2017 3:57:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/29/2017
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The JDEDZ will generate increased traffic, affecting the levels of service and <br /> vehicle queue length spillback in and around the project area. It should be <br /> noted that proposed mitigations in the FSEIR would result in acceptable <br /> levels of service (i.e., duration of delay in traveling through an intersection), <br /> acceptable vehicle queue spillback (i.e., backed-up traffic potentially affecting <br /> operation of an upstream intersection), and acceptable freeway ramp <br /> operations. For more detailed information related to project impacts and <br /> proposed mitigations, please refer to Chapter 4.D of the DSEIR. <br /> C. Assumptions Underlying Term Sheet. <br /> The Parties acknowledge that the goal of this Term Sheet is to fund the <br /> construction of the Project required for the JDEDZ. After execution of this <br /> Term Sheet, the Parties will negotiate in good faith to complete final <br /> Transaction Documents that provides a level of funding allocations <br /> substantially consistent with the Term Sheet. If any of the key assumptions <br /> materially changes during final negotiations, including market conditions or <br /> other key conditions, then the Parties will negotiate in good faith to reach a <br /> fair and balanced agreement. <br /> D. Project Cost Estimate <br /> The following cost estimate for the Project was developed in early 2017: <br />
The URL can be used to link to this page
Your browser does not support the video tag.