Laserfiche WebLink
applied here and there are lots of guidelines that need to be reconciled for a project like <br />this so we look at them altogether. I don't want to disagree with Commissioner Allen's <br />assessment of the guideline regarding metal, but I just want to make the point that we're <br />looking at all of the architectural components of the project together and we felt like due <br />to the limited amount of metal being applied to the siding and the other traditional <br />elements in the overall well designed nature of the project, that the metal was okay. <br />Chair Ritter: The intent of it was we don't want a bunch of stainless steel metal siding <br />and sheet roofs, but you could buy wood floors made out of porcelain now so it's kind of <br />the concept. You don't want them to look like metal, as you said. <br />Commissioner Allen: I didn't want us to get into a discussion because each of us could <br />vet this different and I could see where staff came from. I just wanted to say with regard <br />to these guidelines, there was a discussion at Council, the Council is smart, and the <br />Council has seen high quality metal. There are great examples in Napa. I actually like <br />the design, but is it consistent with these new guidelines that were just developed? And <br />I worry that we could be getting ourselves in trouble if we start opening this door when <br />the door was just specified two years ago. <br />My second area of questioning which I'm realizing was something I wish I had brought <br />up in the workshop, but for some reason we really didn't discuss it too much or I just <br />passed it by, was the setbacks on this property. It just struck me we have a 30 -foot <br />building and the setback at least on the front of Bernal is one -foot. What is the standard <br />zoning setback for office? And what is the standard zoning setback for the homes on <br />Augustine that we just recently approved that are under construction? <br />Amos: The front yard setback in an Office zoning designation is 20 feet. For those <br />houses that are north of the subject site on Augustine for the RM zoning designation, <br />they are allowed to be reduced to 15 feet because they are in the Core Area Overlay <br />District and are zoned RM which allows for those modified development standards. For <br />this particular property, because it's zoned Office, it does not get to take advantage of <br />that modified development standard; however, the PUD offers flexibility in terms of <br />those development standards. But, to answer your question it would be 20 feet for a <br />front yard setback. <br />Commissioner Allen: For a PUD, you could do anything you want, but that's the <br />standard. It ranges between 15 and 20. <br />Amos: Yes. <br />Commissioner Allen: Thank you, and how about side setbacks? <br />Amos: For the Office zoning district, it's a minimum of 10 feet on one side but combined <br />to be 20 between the two so 10 feet on each side. For the rear yard setback I believe its <br />10 feet. <br />Commissioner Allen: Do we have 10 feet between the buildings? <br />PLANNING COMMISSION MINUTES, July 13, 2016 Page 13 of 38 <br />