My WebLink
|
Help
|
About
|
Sign Out
PC 082714
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
MINUTES
>
2010-2019
>
2014
>
PC 082714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 4:20:55 PM
Creation date
8/10/2017 4:17:02 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
MINUTES
DOCUMENT DATE
8/27/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Acting Chair Allen thanked all the speakers for their thoughtful comments and for being <br />so concise. <br />Commissioner Ritter inquired if the original EIR was started before Measures PP and <br />QQ were approved. <br />Mr. Dolan said yes. <br />Commissioner Ritter further inquired if the EIR was then stopped, and tonight's EIR is <br />the new one using the new Measures PP and QQ approved by the citizens of <br />Pleasanton. <br />Mr. Dolan replied that is correct. He indicated that the project changed in response to <br />Measure PP, so the EIR is new and is all based on the current situation. <br />Commissioner Piper stated that she does not have any specific comments other than to <br />thank people for coming out and spending hours participating in this subject. <br />Commissioner Ritter also thanked everyone for coming. He indicated that one thing he <br />wants to make sure is included in the EIR is more details on the calculations on the exit <br />and the egress rights, including Measures PP and QQ, as a number of letters came in <br />saying the calculations were based on rooftop or pad heights. <br />Commissioner Balch stated that he would like to see additional discussion and possible <br />alternatives other than the standard mitigation on the heritage trees issue that was <br />brought up by several speakers and commented on in the EIR. He indicated that a <br />second thing he has concern with is the connection point at 1 -680 in lieu of standard <br />traffic impact fees, which do not appear to help or do anything to that intersection. <br />Mr. Dolan replied that these are legitimate questions and that staff will respond to it in <br />the EIR. <br />Commissioner Balch noted that there is an entire section on Measures PP ad QQ but <br />that he has some difficulty understanding the comments in relation to what structures <br />are qualifying for or not. He indicated that that would be another broad leaf check to <br />make sure that definitions are included. <br />Mr. Dolan explained that Measure PP does not address a lot of the detailed issues, and <br />the analysis on Measure PP in the EIR evaluates and discusses the various <br />interpretations. He stated that the City Council will ultimately opine on some of those <br />issues related to this project, and staff will make use of them. He indicated that when <br />the Planning Commission discusses the merits of this project, it will be perfectly <br />legitimate and appropriate for the Commissioners to include its recommendation on <br />certain aspects of the implementation of Measure PP. He stated that it will not <br />necessarily be an EIR issue, but it will be fair game in staff's analysis. He added that <br />that does not mean staff is going to ignore them but that, fundamentally, the primary <br />PLANNING COMMISSION MINUTES, August 27, 2014 Page 42 of 44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.