Laserfiche WebLink
Institute of Transportation Engineers (ITE) are accurate. He stated that Lil Ivy League <br />creates a little bit more, about one per student, as opposed to the average .8 that ITE <br />had established. He continued that using that study, there will be 20 extra trips in the <br />peak hour, which is an increase of one car every three minutes. He added that even at <br />a worst -case scenario where there will be 20 additional students with 20 vehicles <br />coming in to drop off and another 20 vehicles coming in to pick up for a total of 40 trips, <br />that will still be a car every minute. He indicated that there would then be an estimated <br />740 vehicles instead of 700 vehicles on that road in that peak hour. <br />Chair O'Connor asked Mr. Tassano if he is confident that with the traffic - calming <br />measures, safety will still be in place. <br />Mr. Tassano replied that one of the things that the Traffic Engineering studies <br />determined was that there is actually a very small and not unusual number of vehicles <br />that are speeding, such that when his staff measured Black Avenue, it did not actually <br />come out any different than any other residential street as far as the percentage of <br />speeding vehicles. He explained that the perception seen in neighborhoods is that it is <br />okay if four percent out of 1,000 vehicles are speeding because that is a small number <br />of cars, but when there are 6,000 vehicles, it seems that there are more cars going at <br />that high rate of speed. He indicated that the combination of tools that will be put in will <br />control that speed and actually bring it down to what will be lower than a normal critical <br />speed on a residential street. <br />Chair O'Connor asked Mr. Tassano if, in essence, he thinks there will be a safer <br />environment with traffic - calming, even with the extra 40 vehicles at peak hour. <br />Mr. Tassano said yes. He added that Black Avenue will have one of the most extensive <br />and most expensive traffic - calming programs staff has put together; that the number of <br />tools being put in is something that has not been done in any other location. <br />Mr. Dolan asked Mr. Tassano to comment on what the City's normal annual budget for <br />traffic - calming is. <br />Mr. Tassano replied that the City has an annual budget of $25,000. He noted that this <br />project costs $400,000, and staff presented it to the City Council because they are all <br />valuable tools. He explained that all $400,000 is not going in at one time, and because <br />it could not all come from the $25,000 a year traffic - calming budget, staff is staging it in <br />order to absorb some of that cost by using some Capital Improvement Program (CIP) <br />funds. <br />Commissioner Ritter inquired if staff included any vacancies or projected new additions <br />to the area when it did the analysis. He noted that this is only for 20 additional students <br />and inquired about other building down the street that may come back and say it wants <br />to change its usage to another 100 people. <br />Mr. Tassano said no. He explained that what staff did and will look at is what it expects <br />to occur in the General Plan; for example, if there is a vacant parcel, staff would assume <br />that that vacant parcel will be filled with something. He noted that this location is pretty <br />PLANNING COMMISSION MINUTES, June 11, 2014 Page 5 of 12 <br />