Laserfiche WebLink
Ell ENGINEERING <br /> SCOPE OF WORK <br /> GENERAL DESCRIPTION OF WORK <br /> The City of Pleasanton desires to construct a southbound right turn lane along Hopyard Road at the <br /> Owens Drive intersection. On the south side of the Hopyard Road/Owens Drive intersection, <br /> modifications include adding a second northbound left turn lane and eliminating the northbound free <br /> right turn lane. This project also includes adding a southbound bike lane to close the existing bike lane <br /> gap from the 1-580 eastbound off-ramp intersection to 180 feet south of Owens Drive. The proposed <br /> improvements within State right of way require an encroachment permit from Caltrans. <br /> WORK PLAN OUTLINE <br /> 1. Project Management&Coordination <br /> 1.1 Project Management <br /> 1.2 Kick off Meeting <br /> 1.3 City Coordination and Project Review Meetings <br /> 1.4 Assist City in Preparing Exhibits (ROW, CEQA, etc.) <br /> 2. Prepare Detailed Preliminary PS&E(65%Complete) <br /> 2.1 Utility Identifications and Coordination (including Pothole allowance) <br /> 2.2 Supplemental Field Surveying <br /> 2.3 Prepare 65% Roadway Plans <br /> 2.4 Prepare 65%Traffic Signal/Electrical Plans <br /> 2.5 Prepare Design Exception Fact Sheet <br /> 2.6 Prepare 65%Construction Cost Estimates <br /> 2.7 Prepare Specifications <br /> 2.8 Submit 65%Deliverables to City <br /> 2.9 Prepare and Submit Draft Caltrans Encroachment Permit Application on Behalf of City <br /> 3. Prepare Detailed Preliminary PS&E (95%Complete) <br /> 3.1 Prepare 95% Roadway Plans <br /> 3.2 Prepare 95%Traffic Signal/Electrical Plans <br /> 3.3 Prepare 95%Construction Cost Estimates <br /> 3.4 Prepare Specifications <br /> 3.5 Submit 95% Deliverables to City <br /> 3.6 Submit Draft Caltrans Encroachment Permit Application on Behalf of City <br /> developing YOUR vision delivering YOUR project <br /> www.Qrincyeng.corn 2950,Buskirk,Avenue, Suite 1,22 I Walnut Creek, CA 94597 I P. 925.939.7100 I F:'925.210.0500 <br />