My WebLink
|
Help
|
About
|
Sign Out
09
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
081517
>
09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2017 3:14:47 PM
Creation date
8/9/2017 11:14:44 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
8/15/2017
DESTRUCT DATE
15Y
DOCUMENT NO
09
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.4 Prepare Record Drawings(As-Builts) <br /> Upon completion of project,Quincy will provide record drawings per the City requirements. The <br /> record drawings will be based on mark ups from the Resident Engineer as revisions are made <br /> during construction. <br /> ASSUMPTIONS IN SCOPE OF WORK <br /> • City to provide environmental clearance. <br /> • City to provide the traffic index(TI)for pavement structural section design. <br /> • City to provide additional base mapping that covers Hopyard Road/I-580 off-ramp intersection <br /> and Hopyard Road/Gibraltar Drive intersection (North leg at minimum) <br /> • No right of way acquisition, plats or legal descriptions are required. <br /> • City to provide all available record maps and improvement plans of adjacent development, <br /> roadways, utilities,etc. <br /> • City to advertise, award and administer,the construction contract. <br /> • Scope does not include preparation of a SWPPP. <br /> • City to be responsible for all agreements with other agencies or entities. <br /> • City to provide Rights-of-Entry and all Permits for field work. <br /> • Scope does not include noise monitoring nor existing/future noise assessments <br /> • There are no Federal funds on this project <br /> • Planting and irrigation design is not included in this scope of work <br /> • Street lighting in the medians will not be reevaluated/redesigned. Median street lighting to be <br /> reset or shifted slightly as needed due to median island improvements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.