My WebLink
|
Help
|
About
|
Sign Out
13
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
071817
>
13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 9:13:34 AM
Creation date
7/12/2017 8:32:49 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/18/2017
DESTRUCT DATE
15Y
DOCUMENT NO
13
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKGROUND <br /> The Annual Curb & Gutter Replacement for Street Resurfacing project consisted of <br /> removing and replacing 2,012 square feet of sidewalk that presented potential tripping <br /> hazards, 688 linear feet of cracked curb and gutter that had drainage problems, and <br /> installing 75 new intersection ramps for ADA accessibility. The project also included the <br /> installation of traffic calming bulb-outs on Black Avenue. <br /> On December 20, 2016, Pleasanton's City Council awarded the contract to the lowest <br /> responsible bidder, Victor Concrete, Inc. in the amount of $575,100. Council authorized <br /> the Director of Engineering to approve change orders up to the project contingency <br /> amount of $28,574. The project has since been completed and is ready for acceptance. <br /> DISCUSSION <br /> Budget <br /> Funding for the project was provided by $250,000, from the Annual Curb and Gutter <br /> Replacement Project, CIP 15509 and transfers totaling $261,326 from two Annual <br /> Sidewalk and Intersection Ramp Installation projects, CIP nos. 15505 and 16505. <br /> Additionally, $75,000 was used from the Black Avenue Traffic Calming Phase 2 project, <br /> CIP No. 15549, and $28,000 was used from the Bicycle and Pedestrian Related <br /> Improvements project, CIP No.16543. The only change order on the contract with Victor <br /> Concrete was the balancing change order which resulted in a reduction of $3,910 to the <br /> contract due to actual quantities of items being less than the engineer's estimate. <br /> However, when it was discovered that the widening of Hopyard Road for the bike lanes <br /> would result in major damage to the roots of a tree, West Coast Arborists was called in <br /> to remove the tree at a cost of$1,913. <br /> The final project funding and expenditures are summarized in Attachment 1, indicating a <br /> total project expenditure of$573,429 and remaining funds of$40,897. <br /> Submitted by: Fiscal Review: Approved by: <br /> /AA-Stephe irkpatrick Tina Olson Nelson Fialho <br /> Director of Engineering Director of Finance City Manager <br /> Attachments: <br /> 1. Funding and Expenditure Summary <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.