My WebLink
|
Help
|
About
|
Sign Out
11
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
071817
>
11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 9:06:02 AM
Creation date
7/12/2017 8:32:46 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/18/2017
DESTRUCT DATE
15Y
DOCUMENT NO
11
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF _ T_ 1 ,g <br /> - CITY COUNCIL AGENDA REPORT <br /> pLEASAcNTON. <br /> July 18, 2017 <br /> Engineering <br /> TITLE: APPROVE A PROFESSIONAL SERVICES AGREEMENT WITH JEFF KATZ <br /> ARCHITECTURE IN THE AMOUNT OF $468,000 TO DESIGN AND ASSIST <br /> WITH CONSTRUCTION MANAGEMENT OF THE FIRE STATION THREE <br /> REPLACEMENT PROJECT, CIP NO. 17423 <br /> SUMMARY <br /> Fire Station Three, located at the intersection of West Las Positas Boulevard and Santa <br /> Rita Road was built in 1973 and has been in service ever since. In 2016 a study was <br /> performed to determine if the building could be renovated or remodeled to continue to <br /> meet the needs of the Livermore Pleasanton Fire Department, or if the building has <br /> reached the end of its useful life and requires replacement. The study assessed the <br /> physical condition of the building, as well as the demands on the building by the Fire <br /> Department both today and into the foreseeable future. The study determined the fire <br /> station building was beyond renovation and should be replaced, and went on to develop <br /> a concept design along with a design and construction cost estimate for the concept <br /> design. In total, including design and construction, the cost was estimated to be <br /> approximately$4.1 million. This amount is budgeted in the Capital Improvement Program <br /> under CIP project number 17423. The proposed professional services agreement with <br /> Jeff Katz Architecture (JKA) in the amount of $468,000 is to design and assist with <br /> construction management of a new Fire Station Three. Through a competitive Request <br /> for Qualification (RFQ) process, JKA was selected as the most qualified consultant to <br /> assist the City of Pleasanton on this project. <br /> RECOMMENDATION <br /> 1. Approve the attached professional services agreement with Jeff Katz Architecture in <br /> the amount of$468,000 to design and assist with construction administration of a new <br /> Fire Station Three. <br /> 2. Authorize the City Manager to execute the professional services agreement with JKA <br /> in the amount of $468,000. <br /> FINANCIAL STATEMENT <br /> There is $4,085,000 currently budgeted in the Capital Improvement Program (CIP) <br /> Budget for this project: Fire Station Three Replacement Project, CIP No. 17423. <br />
The URL can be used to link to this page
Your browser does not support the video tag.