Laserfiche WebLink
CRESTLINE RD RAVEN RD VALLEY AVE 75446 SS <br /> WILLET WAY CANARY DR(EAST) CANARY DR(WEST) 34977 SS <br /> GAPWALL CT BLACKBIRD CT END 11345 SS <br /> SANDPIPER WAY HUMMINGBIRD RD(WEST) HUMMINGBIRD RD(EAST) 36371 SS <br /> BLACKBIRD DR WOODTHRUSH DR VALLEY AVE 112219 SS <br /> GREENWOOD RD MOHR AVE VALLEY AVE 69795 SS <br /> CARLSBAD CT VALLEY TRAILS DR END 10502 SS <br /> CARLSBAD WAY VALLEY TRAILS DR EVERGLADES CT 15612 SS <br /> EVERGLADES CT CARLSBAD WAY END 7667 SS <br /> CRATERLAKE CT CARLSBAD WAY END 11745 SS <br /> BIG BEND CT NATIONAL PARK RD END 6529 SS <br /> BRYCE CYN CT NATIONAL PARK RD END 14150 SS <br /> S GLACIER CT VALLEY TRAILS DR END 15642 SS <br /> S HAWAII CT VALLEY TRAILS DR END 19517 SS <br /> S OLYMPIC CT VALLEY TRAILS DR END 18314 SS <br /> N GETTYSBURG CT VALLEY TRAILS DR END 9579 SS <br /> N HAWAII CT VALLEY TRAILS DR END 11719 SS <br /> N OLYMPIC CT VALLEY TRAILS DR END 13982 SS <br /> MAMMOTH CAVE CT VALLEY TRAILS DR END 8747 SS <br /> N PLATT CT VALLEY TRAILS DR END 10659 SS <br /> N YOSIMITE CT VALLEY TRAILS DR END 8412 SS <br /> HARPERS FERRY CT VALLEY TRAILS DR END 17227 SS <br /> CUMBERLAND GAP CT VALLEY TRAILS DR END 17616 SS <br /> KINGS CANYON CT VALLEY TRAILS DR END 20782 SS <br /> YELLOWSTONE CT VALLEY TRAILS DR END 20707 SS <br /> LASSEN ST VALLEY TRAILS DR MT RAINIER CT 16121 SS <br /> STANLEY BLVD CALIFORNIA AVE CITY LIMITS 155295 SS <br /> Old Foothill Road Improvements <br /> East Bay Regional Park District (EBRPD) is working with the City to install a trail head <br /> access on Old Foothill Road. Engineering staff has been working with EBRPD, <br /> residents, and the Community Services Department to develop improvement plans for <br /> Old Foothill Road that will provide safe and community-friendly access to the proposed <br /> trail, Alviso Adobe Community Park, and residences. EBRPD has entered into an <br /> agreement to reimburse the City for the Old Foothill Road improvements. <br /> The Old Foothill road improvements consist of two parts and are included under two <br /> separate City projects for constructability and cost savings. <br /> Part 1: Concrete curb/gutter and storm drain facility relocation on Foothill Road at Jerlin <br /> Place is necessary for roadway widening to provide ample right-turn movement from <br /> Foothill Road onto Jerlin/Old Foothill Road. Part 1 is currently under construction and <br /> included under the City's Annual Concrete Curb and Gutter Replacement project, CIP <br /> No. 16509. <br /> Part 2: Old Foothill Road, between Jerlin Place and the Alviso Adobe parking lot, will be <br /> converted from two-way traffic to one-way traffic in the southbound direction to provide <br /> an additional 45 parking stalls and accommodate a 4-foot wide pedestrian path along <br /> the shoulder on the south side of the roadway. Modifications to the existing shoulder <br /> and storm drain inlet structures and roadway widening are also included as part of this <br /> Page 7 of 10 <br />