My WebLink
|
Help
|
About
|
Sign Out
08
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
071817
>
08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2017 8:43:05 AM
Creation date
7/12/2017 8:32:42 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/18/2017
DESTRUCT DATE
15Y
DOCUMENT NO
08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan—Pleasanton Trails Master Plan June 20,2017 <br /> environmental analysis,technical studies,access requirements,agreements or permits,and <br /> construction.The plan will include a current summary of potential funding sources for trails and <br /> a strategy for how to fund the trail system, matching projects to sources where <br /> feasible/applicable. <br /> 4.6. Administrative Review.TrailPeople will transmit the draft Trails Master Plan to the City and <br /> attend a conference call with City staff,and potentially partner agencies such as EBRPD and <br /> Zone 7,to review the preliminary products and prepare for the BPTC and publication. Based on <br /> comments and direction from the City TrailPeople will revise the products for presentation to <br /> the BPTC and PRC. <br /> Deliverables(administrative,draft,and public versions of Draft Trail Master Plan, including): <br /> • Introduction and Summary <br /> • Setting and Process <br /> o Planning Context <br /> o Background Documents Summary <br /> o Public Input Process and Results <br /> • Goals, Policies and Objectives <br /> • Standards and Guidelines <br /> o Trail Types <br /> o Signage and Wayfinding <br /> o Trail Use Management <br /> o Trail Operation and Maintenance <br /> • Trail System <br /> o Overall and Segment Maps <br /> o Tables and Descriptions <br /> o Focus Area Plans <br /> • Implementation <br /> o Priorities and Phasing <br /> o Implementation Steps <br /> o Funding Opportunities and Strategy <br /> • Technical Appendices <br /> 5. Plan Finalization <br /> 5.1. Joint Bicycle Pedestrian and Trails Committee Meeting and Parks and Recreation Commission <br /> Meeting.TrailPeople will attend a meeting with BPTC and PRC,to present the final draft Trails <br /> Master Plan. <br /> 5.2. Planning Commission Meeting.Similar to the joint BPTC and PRC meeting,TrailPeople will <br /> attend a meeting with the Planning Commission,to present the final draft Trails Master Plan. <br /> Based on input from the BPTC, PRC,and Planning Commission the draft will be revised for <br /> presentation to the City Council (revisions are assumed to be minor at this stage). <br /> TrailPeople,Landscape Architects and Planners 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.