Laserfiche WebLink
68. The applicant or responsible party shall pay any traffic impact fees for the <br /> development as determined by the City Traffic Engineer. This fee shall be paid <br /> prior to issuance of a permit, unless otherwise stated in the development <br /> agreement. <br /> 69. Comprehensive traffic control measures shall be implemented during construction, <br /> including scheduling of major truck trips and deliveries, to avoid peak travel hours. <br /> If necessary, as determined by the Traffic Engineer, proper lane closure <br /> procedures such as flagger stations, signage, cones, and other warning devices <br /> shall be implemented during construction. <br /> 70. The haul route for all materials to and from the project site shall be approved by <br /> the City's Traffic Engineer prior to issuance of a building permit, and shall include <br /> the provision to monitor the street surfaces used for the haul route so that any <br /> damage and debris attributable to the haul trucks is identified and corrected at the <br /> expense of the project applicant or developer. <br /> 71. The plans submitted to the Building and Safety Division for plan check shall include <br /> improvement plans for this development that contain signage and striping details. <br /> Said improvement plans shall be subject to the review and approval of the City <br /> Traffic Engineer prior to building permit issuance. <br /> STANDARD CONDITIONS OF APPROVAL <br /> Planning Division <br /> 72. The proposed Planned Unit Development Plan shall conform substantially to the <br /> project plans, colors and materials, and arborist report, Exhibit B, dated "Received <br /> January 11, 2017," on file with the Planning Division, except as modified by these <br /> conditions of approval. Minor changes to the plans may be allowed subject to the <br /> approval of the Director of Community Development if found to be in substantial <br /> conformance to the approved exhibits. <br /> 73. All conditions of approval shall be attached to all building permit plan check sets <br /> submitted for review and approval, whether stapled to the plans or located on a <br /> separate plan sheet. These conditions of approval shall be attached at all times to <br /> any grading and construction plans kept on the project site. It is the responsibility <br /> of the applicant to ensure that the project contractor is aware of, and abides by, all <br /> conditions of approval. It is the responsibility of the applicant to ensure that the <br /> project landscape contractor is aware of, and adheres to, the approved landscape <br /> and irrigation plans, and all conditions of approval. Prior approval from the <br /> Planning Division is required before any changes are constituted in site design, <br /> grading, building design, building colors or materials, green building measures, <br /> landscape material, etc. <br /> 74. The approved building colors and materials shall be indicated on the final building <br /> permit plans. Any proposed revisions to these approved colors or materials must <br /> P16-1384, P16-1386, P17-0155 & PUD-113, Ponderosa Homes II, INC. City Council <br /> Page 14 of 30 <br />