Laserfiche WebLink
estimated at approximately $1 million. Attachment 1 is the proposed floor plan layout, <br />and Attachment 2 is the preliminary cost estimate for the construction of the project. <br />The design and construction of this project will be on an expedited schedule in order to <br />complete all of the renovation work before the summer season of 2018. Staff anticipates <br />that the aquatic center may need to be partially shut down between November 2017 <br />and early April 2018. As an alternative to closing the facility, temporary trailer- contained <br />locker rooms may be utilized during construction depending on availability and cost. <br />These decisions will be made as part of the design and bidding process and will be <br />reported to City Council when the construction project award is considered. <br />Finally, the proposed agreement, including the scope of work, is attached for reference <br />(Attachment 3). <br />Submitted by: <br />Stephen K'atrick <br />Director of Engineering <br />Fiscal Review: <br />(✓t A <br />Tina Olson <br />Director of Finance <br />Nelson Fialho <br />City Manager <br />Attachments: <br />1. Proposed floor plan layout <br />2. Preliminary cost estimate <br />3. Proposed design professional consultant contract with Arch -Pac, Inc. <br />Page 3 of 3 <br />