Laserfiche WebLink
Downtown Parking Strategy and Implementation Plan—Public Comments ATTACHMENT 3 <br /> When parking saturation is reached, people start calling for moratoriums on further <br /> development. Planners, politicians, neighbors,and fellow businesses start demanding <br /> denial of proposed conditional use permits and design review approvals until the <br /> "parking problem" is solved. <br /> The Coming Parking Crunch <br /> Parking supply can still function adequately when parking is tight, because finding one <br /> space solves the problem for each driver. But,when parking saturation is reached, <br /> such as with no parking spot within two blocks,the customer may quit that venue, and <br /> alter shopping habits to avoid visiting that location. The Millard-Ball study in San <br /> Francisco cited below found that the probability of finding a parking space goes quickly <br /> to zero when average hourly occupancy exceeds 90 percent(2). <br /> A closer look at the Hexagon Parking Survey reveals just how bad the impending <br /> parking scarcity will become. <br /> Pastime Plaza: <br /> Parking Demand 23 spaces(Ord. req'mt) <br /> Public Spaces available: <br /> Within 1 block: 2.6 vacant spaces <br /> 1 to 2 blocks away: 24.5 vacant spaces* <br /> Total 27.1 vacant spaces <br /> (*incl.9.8 spaces on dirt lot behind train station-Lot B) <br /> When Pastime Plaza opens for business,every public parking space within two blocks <br /> will typically be occupied. <br /> Options? <br /> 1. Parking garage (e.g.on Bank of America lot). <br /> 2. Vest pocket parking lots near core(e.g. Spring Street lot shown on Downtown <br /> Specific Plan) <br /> 3. Shared parking arrangements on specific blocks(e.g. The parking assessment <br /> district on the block bordered by Division, St. Mary's, Peters and Main). <br /> 4. Put a price on downtown parking (as with parking meters). <br /> 5. For the longer term solution,expanded use of in lieu parking fees to later fund 1. <br /> and 2.above. <br /> Briefly,as a starting point for the Downtown Vitality Committee discussion: <br /> 4 <br /> Provided to Planning Commission for March 8,2017 Meeting and City Council for April 18,2017 Meeting 18 <br />