My WebLink
|
Help
|
About
|
Sign Out
15
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
041817
>
15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 10:23:59 AM
Creation date
4/11/2017 4:17:21 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
4/18/2017
DESTRUCT DATE
15Y
DOCUMENT NO
15
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A couple of residents of Parkside asked that the booster station be located near Hart <br /> Middle School, or at the maintenance facilities on the south side of the park. At Hart <br /> Middle School additional property would have to be purchased. At Hart Middle School is <br /> also not the appropriate location hydraulically because it would increase the pressure <br /> before the losses experienced by the system after the water travels deep under the <br /> Arroyo Mocho to the Sports Park. The maintenance facility site would require hydraulic <br /> modeling and could cause similar concerns from residents along the south side of the <br /> park. In addition this location would have the highest cost of implementation. <br /> Next Steps <br /> Upon the selection of the booster pump location, detailed plans and specifications will <br /> be developed for the additional piping, site work, installation of station and electrical <br /> feed to the station. An application will be submitted to PG&E to provide service to the <br /> new station. The installation will be publicly bid and brought back to City Council for <br /> award in mid-summer. <br /> The construction of the station will be off site and will take approximately twenty weeks <br /> to fabricate the station, and about one month to install the station on site, including the <br /> installation of the associated piping, concrete pad, fencing, and plants. The booster <br /> station installation will most likely be completed in fall of 2017. <br /> Schedule <br /> The proposed schedule to complete the work on the recycled water project is as follows: <br /> April 2017 Purchase Prepackaged Booster Station <br /> May 2017 Complete the design of piping and site improvements <br /> July 2017 Award installation of station and site improvements <br /> October 2017 Project Completion <br /> Submitted b : Fiscal Review: Approved y: <br /> Stephen "kpatrick Tina Olson Nelson Fialho <br /> Director o Engineering Director of Finance City Manager <br /> Attachments: <br /> 1. Proposed Layout of Station at Location 2 - Hard Ball C <br /> 2. Patterson Pump Proposal, dated February 6, 2017 <br /> Page 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.