Laserfiche WebLink
fencing and evergreen shrubs were not considered in the noise specifications, but it is <br /> expected they will further reduce the sound levels. The anticipated noise level at the <br /> nearest window (150-feet away) based on the recommended location is estimated at 15 <br /> dBA (quieter than a quiet rural nighttime). <br /> Staff only presented the proposed Location 2 to the Parks and Recreation Commission, <br /> but based upon comments received, is presenting to City Council all the locations that <br /> were reviewed during the design process. This pump station is an in-line system <br /> installed on the main 16-inch pipeline that passes under the Arroyo Mocho and enters <br /> the park adjacent to Harvey Court. Installation of the system requires the 16-inch <br /> pipeline to be extended to the station, then back to point of connection, in effect <br /> "looping" the piping through the pump station and back. Therefore, the primary cost <br /> difference when choosing a location is the installation of 16-inch diameter pipelines and <br /> the access path. The cost per foot of two 16-inch pipelines and access path is estimated <br /> to be approximately $650 per linear foot. Using this estimated cost, the top four <br /> locations and the associated impacts are discussed below. Staff recommends Location <br /> 2 - Hard Ball C, to minimize the impacts to the surrounding neighborhood. <br /> PLEASANTON SPORTS & RECREATION PARK <br /> 5800 Parkside Drive <br /> - JL_JLJLARLc,HSR-4HUL JUI \ <br /> nJEy,N�' OR ■ ■ - <br /> P / KING PARKING '1.'11 KNG - — PARKING - <br /> 2 at ". SF 7 :....0 R'c et LL R LL a PARniNr ner l-r `Y <br /> - - Ner 3 usa ve <br /> iPPaK` ASB 4 R 1t'CP - ._ R rut - u.e e9 <br /> PP 1r"Ga C1 ASB 1 P NB'A' G90A SF LL tl3 O•l'-.1 SF 10 C4 R <br /> SF 1 ,SF 2)SF 3 csem F 5 SF 6 SF 8 SF11 FB.2 <br /> ASB 3 - ___,.i I - - _ SF 12 <br /> LL a9 LL69 - Fe Ka <br /> ASB 2 <br /> GSB. LL� <br /> - SF4 I 13'8' I.L r'D <br /> \ •PARKING#'!S.._... _ <br /> LEGEND <br /> SF Soccer Field BC IL•thnc Cage <br /> HB Ilardball Fidd ST Skateboard fmck <br /> LL I.mic Icape I u•IJ SGS tiocccr Goal Stomp: F::r inl'n n c:dl Purl.X <br /> Comm unit.Service.at(925)93-5 349 <br /> ASS Adnll Softball Field C Con casinos <br /> GSB Softball Field R Restroom <br /> FB I`tnahall field V Youth l'la■ <br /> BB Babkctball Held F Footbridttc rLEASANTON, <br /> VB VnlIer hall M Sp.,nvpnrk Memorial <br /> P Picnic Area <br /> 4Iup;Award/n•Cory,j'Ploo n/on;IS Department <br /> Location 1 (see image) — End of Arroyo Mocho Crossing <br /> The ideal location for the pump station, from an engineering standpoint, is at the <br /> southern end of the Arroyo Mocho crossing where the 16-inch pipeline enters the park. <br /> This location is directly opposite Harvey Court, and just a few feet south of the park <br /> driveway access. Location 1 would have minimum hydraulic impacts and be the least <br /> expensive. The location would not impact the sports fields or other activities at the park. <br /> The station would have minimal sound impacts to the residents located approximately <br /> Page 4 of 6 <br />