My WebLink
|
Help
|
About
|
Sign Out
ORD 2157
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2157
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
3/10/2017 1:37:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
2/21/2017
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2157
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(setbacks) are pursuant to the approved plans, prior to receiving a foundation inspection <br /> for the structures. <br /> 33. All excess soil from the site shall be off-hauled from the site and disposed of in a lawful <br /> manner using a City approved haul route. Unless otherwise approved by the Director of <br /> Community Development, no stockpiling of dirt on this site shall occur. <br /> 34. Rain gutters shall discharge into landscaping planter areas where feasible. These details <br /> shall be shown on the plans submitted to the Building and Safety Division for plan check <br /> and are subject to the review and approval of the Director of Community Development prior <br /> to building permit issuance. <br /> 35. The new homes shall be constructed to allow for future installation of a Photovoltaic (PV) <br /> system and solar water heating systems. The project applicant/developer shall comply <br /> with the following requirements for making the proposed residential units photovoltaic- <br /> ready and solar-water-heating-ready: <br /> a. Electrical conduit and cable pull strings shall be installed from the roof/attic area to the <br /> building's main electrical panels; <br /> b. An area shall be provided near the electrical panel for the installation of an "inverter" <br /> required to convert the direct current output from the photovoltaic panels to alternating <br /> current; <br /> c. Engineer the roof trusses to handle an additional load as determined by a structural <br /> engineer to accommodate the additional weight of a prototypical photovoltaic system <br /> beyond that anticipated for roofing; <br /> d. Plumbing shall be installed for solar-water heating; and <br /> e. Space shall be provided for a solar-water-heating tank. <br /> These measures shall be shown on the building permit plan set submitted to the Director of <br /> Community Development for review and approval before issuance of the first building <br /> permit. <br /> 36. The State of California's Green Building Standards Code, "CALGreen," shall apply, if <br /> applicable. <br /> 37. The developer shall comply with the recommendations of the noise assessment entitled <br /> "Irby Ranch, Pleasanton, CA Environmental Noise Assessment" by Charles M. Salter <br /> Associates, Inc., dated "11 February 2015," on file with the Planning Division with the <br /> exception that the 8-foot wall adjacent to the tree park along Stanley Boulevard shall not be <br /> installed. Details of the noise mitigations shall be submitted in conjunction with the plans <br /> submitted for issuance of building permits and shall be subject to review and approval by <br /> the Director of Community Development prior to issuance of building permits for the <br /> project. The applicant's noise consultant shall review the applicable noise mitigations <br /> PUD-110, Irby Ranch City Council <br /> Page 7 of 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.