My WebLink
|
Help
|
About
|
Sign Out
02
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2017
>
022117
>
02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 12:57:27 PM
Creation date
2/16/2017 1:35:04 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
2/21/2017
DESTRUCT DATE
15Y
DOCUMENT NO
02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Model B3 <br />a. Reverse the material application and use horizontal siding on the 2nd and <br />3rd floors and stucco on the 1st floor. <br />Lots 8 -16 and Lots 86 and 87 <br />b. Redesign the front/rear elevations (facing the street) for Lots 8 -16 and Lots <br />86 and 87 to provide design detailing on the true front, which is labeled <br />"rear" on elevation drawings, instead of detailing the true rear side of the <br />units labeled "front' on elevation drawings. <br />Model B3. C1, CIE, C2. C2E, and D <br />c. Add window style /detail from the Al and A2 units. <br />Model C1 and C1 <br />d. Add a railing on the 1 st floor front porch <br />Model D <br />e. Use all horizontal siding instead of siding /stucco. <br />f. Add shutters to the double window on the rear elevation. <br />g. Remove the shutters on the side elevation of Unit DIE. <br />h. Incorporate a railing on the front porch. <br />Construction of the overall project may be phased based on the Growth Management <br />Allocation per year. The Nevada Street extension and intersection improvements shall be <br />under construction prior to occupancy of the first home and completed prior to occupancy <br />of half of the homes. Parking, private streets, Nevada Street improvements, street access, <br />common open space amenities, and other infrastructure requirements to match the <br />building intensity proposed in any phase shall be reviewed and approved by the Director of <br />Community Development, City Engineer, and Fire Marshall prior to engineering and /or <br />building permit(s) for each project phase or building(s) within each phase. <br />6. Details of the horizontal siding of the new single family homes shall be incorporated into the <br />plans submitted to the Building and Safety Division for plan check and permit issuance and <br />shall be subject to the review and approval of the Director of Community Development prior <br />to issuance of building permits. <br />7. The stucco for the homes shall be smooth light sand finish. Prior to issuance of the first <br />building permit, the applicant shall submit a finished stucco sample for the buildings. The <br />stucco sample shall be subject to the review and approval of the Director of Community <br />Development prior to application /installation on the buildings. <br />8. Wood -, fiberglass -, or vinyl- framed /sashed windows shall be utilized on the structures. If <br />fiberglass- or vinyl- framed /sashed windows are used, they shall have a similar frame and <br />sash thickness as found on a traditional wood - framed /sashed window unless the required <br />noise mitigation for this project prevents compliance with this requirement. In addition, <br />simulated mullions must appear real and be on both sides of the glass. Windows of new <br />PUD -110, Irby Ranch <br />Page 2 of 32 <br />City Council <br />
The URL can be used to link to this page
Your browser does not support the video tag.