Laserfiche WebLink
73 Plans submitted for engineering and/or building permits shall be revised to shift the <br /> east/west cross walk on the north side of First Street/Stanley Boulevard to be parallel to <br /> the sidewalk, the turn radius at the northeast corner of the intersection (Stanley/Old <br /> Stanley) shall be modified to promote slower turning speeds, and the crosswalk on the east <br /> side of the intersection to be moved forward toward the intersection to the extent possible, <br /> however, a 10 foot minimum separation between radii is required between the northbound <br /> and southbound left turns The ADA ramps at the northeast and southeast corners shall be <br /> revised as needed Final plans are to be reviewed and approved by the City Engineer, City <br /> Traffic Engineer and Director of Community Development prior to issuance of building <br /> permits for the project <br /> 74 The applicant shall design and install all needed modifications to the traffic signal system at <br /> the intersection of Stanley/First/Nevada to provide full eight phase operation with protected <br /> left turns This includes <br /> a Modifying the design/geometry of all legs of the intersection <br /> b All needed changes to signal heads and equipment <br /> c Upgrade of vehicle detection system to current standards including bicycle <br /> detection <br /> d Provide accessible pedestrian push buttons <br /> e Intersection signing and striping <br /> f Any additional modifications needed to upgrade traffic signal system to current <br /> standards <br /> 75 The developer shall comply with the recommendations of the traffic analysis entitled <br /> "Transportation Assessment for Irby Ranch, Pleasanton" by Fehr & Peers Inc , dated "June <br /> 17, 2016," on file with the Planning Division with the exception of Recommendations 4, 5, <br /> 9, 10, and 12 <br /> Landscaping <br /> 76 The applicant/project developer shall comply with the recommendations of the tree report <br /> prepared by HortScience, Inc The project developer shall arrange for the horticultural <br /> consultant to conduct a field inspection prior to issuance of City permits to ensure that all <br /> recommendations have been properly implemented The consultant shall certify in writing <br /> that such recommendations have been followed <br /> 77 Plans submitted for engineering and/or building permits shall include complete landscape <br /> plans for all new improvements at the intersection of Nevada Street and Stanley <br /> Boulevard/First Street The developer shall be responsible for installing all new and <br /> replaced landscaping and irrigation along each corner and street frontage The revised <br /> plans shall be reviewed and approved by the City Landscape Architect, City Engineer and <br /> Director of Community Development prior to issuance of engineering and/or building <br /> permits for the project <br /> 78 The project shall comply with the State of California Model Water Efficient Landscape <br /> Ordinance and Bay Friendly Basics Landscape Checklist Prior to issuance of an <br /> PUD-110, Irby Ranch City Council <br /> Page 14 of 31 <br />