Laserfiche WebLink
c Engineer the roof trusses to handle an additional load as determined by a structural <br /> engineer to accommodate the additional weight of a prototypical photovoltaic system <br /> beyond that anticipated for roofing, <br /> d Plumbing shall be installed for solar-water heating, and <br /> e Space shall be provided for a solar-water-heating tank <br /> These measures shall be shown on the building permit plan set submitted to the Director of <br /> Community Development for review and approval before issuance of the first building <br /> permit <br /> 34 The State of California's Green Building Standards Code, "CALGreen," shall apply, if <br /> applicable <br /> 35 The developer shall comply with the recommendations of the noise assessment entitled <br /> "Irby Ranch, Pleasanton, CA Environmental Noise Assessment" by Charles M Salter <br /> Associates, Inc , dated "11 February 2015," on file with the Planning Division with the <br /> exception that the 8-foot wall adjacent to the tree park along Stanley Boulevard shall not be <br /> installed Details of the noise mitigations shall be submitted in conjunction with the plans <br /> submitted for issuance of building permits and shall be subject to review and approval by <br /> the Director of Community Development prior to issuance of building permits for the <br /> project The applicant's noise consultant shall review the applicable noise mitigations <br /> shown on the building permit plans to ensure that the recommendations have been <br /> properly incorporated into the design The consultant shall certify in writing that such <br /> recommendations have been followed <br /> Housing Element and Climate Action Plan General Plan Amendment and Rezonings <br /> Mitigation Monitoring and Reporting Plan <br /> 36 Mitigation Measure 4 B-1 Prior to the issuance of a grading or building permit, <br /> whichever is sooner, the project developer shall submit an air quality construction plan <br /> detailing the proposed air quality construction measures related to the project such as <br /> construction phasing, construction equipment, and dust control measures, and such plan <br /> shall be approved by the Director of Community Development Air quality construction <br /> measures shall include Basic Construction Mitigation Measures (BAAQMD, May 2011) <br /> and, where construction-related emissions would exceed the applicable thresholds, <br /> Additional Construction Mitigation Measures shall be included on all grading, utility, <br /> building, landscaping, and improvement plans during all phases of construction <br /> 37 Mitigation Measure 4 C-la Pre-construction Breeding Bird Surveys Prior to development <br /> of each phase of project activities that have the potential to result in impacts on breeding <br /> birds, the project developer shall take the following steps to avoid direct losses of nests, <br /> eggs, and nestlings and indirect impacts to avian breeding success <br /> a If grading or construction activities occur only during the non-breeding season, <br /> between August 31 and February 1, no surveys will be required <br /> PUD-110, Irby Ranch City Council <br /> Page 7 of 31 <br />