Laserfiche WebLink
I <br /> 27 All residential units within the boundary of the Downtown Specific Plan area shall <br /> contribute $2,500 per new unit to the Bernal Park Reserve Fund prior to issuance of the <br /> first building permit, unless different timing is set forth in the development agreement, for a <br /> total of $50,000 to the Bernal Park Reserve Fund for units located on the Zia property <br /> 28 All exterior lighting, including landscape lighting, shall be directed downward and designed <br /> or shielded so as to not shine onto neighboring properties The project/building developer <br /> shall submit a final lighting plan and include photometrics and drawings and/or <br /> manufacturer's specification sheets showing the size and types of the light fixtures for the <br /> exterior of the buildings The lighting plan shall be subject to the review and approval by <br /> the Director of Community Development prior to issuance of the first building permit for the <br /> project <br /> 29 The final location of pad-mounted transformers shall be subject to approval by the Director <br /> of Community Development prior to issuance of permits by the Building and Safety Division <br /> or Engineering Department Such transformers shall be screened by landscaping to the <br /> satisfaction of the Director of Community Development All transformers shall be shown on <br /> the plans submitted for issuance of permits <br /> 30 The applicant and/or developer shall submit a pad elevation certification prepared by a <br /> licensed land surveyor or registered civil engineer to the Chief Building Official and Director <br /> of Community Development certifying the pad elevations and building locations (setbacks) <br /> are pursuant to the approved plans, prior to receiving a foundation inspection for the <br /> structures <br /> 31 All excess soil from the site shall be off-hauled from the site and disposed of in a lawful <br /> manner using a City approved haul route Unless otherwise approved by the Director of <br /> Community Development, no stockpiling of dirt on this site shall occur <br /> 32 Rain gutters shall discharge into landscaping planter areas where feasible These details <br /> shall be shown on the plans submitted to the Building and Safety Division for plan check <br /> and are subject to the review and approval of the Director of Community Development prior <br /> to building permit issuance <br /> 33 The new homes shall be constructed to allow for future installation of a Photovoltaic (PV) <br /> system and solar water heating systems The project applicant/developer shall comply <br /> with the following requirements for making the proposed residential units photovoltaic- <br /> ready and solar-water-heating-ready <br /> a Electrical conduit and cable pull strings shall be installed from the roof/attic area to the <br /> building's main electrical panels, <br /> b An area shall be provided near the electrical panel for the installation of an "inverter" <br /> required to convert the direct current output from the photovoltaic panels to alternating <br /> current, <br /> PUD-110, Irby Ranch City Council <br /> Page 6 of 31 <br />