My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
120616
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/1/2016 9:22:20 AM
Creation date
11/30/2016 4:38:15 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
12/6/2016
DESTRUCT DATE
15Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 8 Deliverables: <br /> ® Draft alternatives <br /> ® Draft costs <br /> ® Technical Reports 4 Alternatives Report defining alternatives, costs, benefits, and <br /> feedback <br /> TASK 9: RECOMMENDATFI NS AND IMPLEMENTATION PLAN <br /> 9.11 Preferred Scenario Selection <br /> m Review with project management team staff the top five (5) scenarios and develop a <br /> prioritization of those scenarios Receive direction on number of scenarios to include in <br /> final report <br /> e Review the analysis and identify preferred scenario (s) <br /> ® Provide cost benefits, and any stakeholder or public input collected in the discussion of <br /> the preferred scenario (s) in the final report <br /> 9.2 Implementation Guidance <br /> ® Address needs for implementation <br /> ® Provide phasing options <br /> ® Provide guidance that will include cost ranges and funding opportunities form local, <br /> countywide, regional, State and Federal sources <br /> ® Identify staff responsible to perform key tasks <br /> ® Highlight major implementation consideration, estimated level of effort, and phasing for <br /> activities that may be appropriate for implantation over a longer horizon <br /> ® Incorporate all information in the final report <br /> TASK 9: Deliverable <br /> ® Draft and Final Report with recommendations and implementation guidance for PPS and <br /> LAVTA <br /> ® In consideration of feedback collected after the presentation of alternatives, Consultant <br /> shall make a set of final recommendations to LAVTA/PPS that respond to comments and <br /> feedback received during the public input process <br /> • Consultant shall develop an implementation plan for the LAVTA/PPS recommended <br /> changes, including identifying costs and potential funding opportunities for each <br /> recommendation Plan should include recommended changes based on feedback from <br /> both agencies <br /> 171Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.