My WebLink
|
Help
|
About
|
Sign Out
14
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
111516
>
14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2016 12:32:50 PM
Creation date
11/10/2016 12:27:08 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/15/2016
DESTRUCT DATE
15Y
DOCUMENT NO
14
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THE CITY OF 1 4 <br /> -- '"' --� CITY COUNCIL AGENDA REPORT <br /> pLEASANTON, <br /> November 15, 2016 <br /> Engineering <br /> TITLE: ACCEPT PUBLIC IMPROVEMENTS PERFORMED BY GOODLAND <br /> LANDSCAPE CONSTRUCTION, INC. FOR THE PIONEER CEMETERY AND <br /> VETERAN'S MEMORIAL IMPROVEMENTS, CIP NO. 15408 <br /> SUMMARY <br /> The Pioneer Cemetery and Veteran's Memorial Improvements project consisted of <br /> constructing a Veteran's Memorial at the Pioneer Cemetery, which included realigning <br /> the drive aisle around the new concrete plaza with granite monuments, a statue, and <br /> flags, and providing associated demolition, earthwork, grading, and other site <br /> improvements. In addition to the work on the Veteran's plaza, Goodland also repaired <br /> the existing antiquated irrigation system and paved the drive aisle from Sunol Boulevard <br /> to the new memorial plaza. The irrigation work and paving was not part of the original <br /> contract so was accomplished by change order. Construction of all work is complete <br /> and ready for acceptance. <br /> RECOMMENDATION <br /> 1. Accept the improvements for the project. <br /> 2. Authorize the City Clerk to file a Notice of Completion. <br /> 3. Authorize payment of the retention in the amount of $24,269.28 to Goodland <br /> Landscape Construction, Inc. thirty days after recordation of the Notice of <br /> Completion. <br /> 4. Transfer the project balance back to the Pioneer Cemetery Master Plan <br /> Implementation Reserve. <br /> FINANCIAL STATEMENT <br /> Funding for this project at the time of award on June 7, 2016 totaled $520,000. Council <br /> allocated an additional $76,832.88 to the project for irrigation repairs and paving at their <br /> September 6, 2016, meeting; for a total of $596,832.88 in funding. <br /> Project expenditures totaled $537,642, leaving a project balance of $59,191 as outlined <br /> in Attachment 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.