Laserfiche WebLink
Proposal for Pleasanton Downtown Specific Plan Update <br /> Revised Scope and Budget—October 14, 2016 <br /> This is most likely to be a full program-level EIR, a Supplemental EIR, or a Mitigated <br /> Negative Declaration <br /> C Augment consultant team, if needed, to address environmental impact areas <br /> Depending on the nature and extent of impact assessment that is needed, augment <br /> the consultant team to add specialists in various fields The following lists CEQA <br /> impact areas and indicates which consultant team member would be responsible or <br /> would need to be added to the team, assuming that a program-level (not project- <br /> level) EIR would be required <br /> o Aesthetics D&B <br /> o Air Quality D&B <br /> o Biological Resources D&B <br /> o Cultural Resources D&B or Historic Preservation specialist <br /> o Geology/Soils D&B <br /> o Greenhouse Gas Emissions, Energy D&B <br /> o Hazards and Hazardous Materials D&B <br /> o Hydrology and Water Quality D&B, potential assistance from civil <br /> engineer/infrastructure specialist <br /> o Land Use and Planning D&B <br /> o Mineral Resources likely not applicable <br /> o Noise Add noise consultant <br /> o Population and Housing D&B <br /> o Public Services D&B <br /> o Recreation D&B <br /> o Transportation and Traffic Add transportation consultant <br /> o Utilities and Service Systems D&B, potential assistance from civil <br /> engineer/infrastructure specialist <br /> D Prepare Environmental Review Prepare the necessary environmental review for the <br /> revised Specific Plan, the scope of which would vary depending on the type of <br /> environmental document needed The following specifies a basic task list for a <br /> program EIR, which is the most likely type of document needed Greater detail on <br /> any of these steps can be provided if desired <br /> o Prepare Notice of Preparation and conduct scoping meeting <br /> o Decide on significance thresholds with City staff <br /> o Draft environmental settings and impact assessment <br /> o Determine CEQA alternatives to the project for the required alternatives <br /> analysis <br /> 12 <br />