My WebLink
|
Help
|
About
|
Sign Out
06
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
111516
>
06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 11:38:10 AM
Creation date
11/10/2016 11:20:01 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/15/2016
DESTRUCT DATE
15Y
DOCUMENT NO
06
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal for Pleasanton Downtown Specific Plan Update <br /> Revised Scope and Budget—October 14, 2016 <br /> fidget <br /> IFee <br /> The guaranteed maximum fee for the base scope of work for this project is $239,000 This <br /> budget includes all personnel labor, overhead costs, and direct costs, and delivery of <br /> products identified in the Scope of Work Direct costs are billed with no administrative <br /> markup or handling fee <br /> In addition,we recommend that the City include a contingency of 10-15 percent ($24,000 - <br /> $36,000) to cover unanticipated costs or extra tasks that may arise during the course of the <br /> project This could include additional TF meetings or other outreach, additional rounds of <br /> review on draft documents,additional illustrations/graphic simulations,or similar <br /> This fee is a guaranteed maximum and will not be exceeded provided there are no changes <br /> to the Scope of Work Total hours and fee by personnel and by task are in the tables on the <br /> following pages <br /> We have budgeted for all of the tasks with a level of effort that we believe is necessary to <br /> meet the project objectives We are willing to work with the City to reallocate our <br /> budget/efforts,and/or negotiate fees for additional tasks,to better serve the City's needs <br /> Assumptions <br /> Our budget is based on the following assumptions <br /> 1 Meeting Attendance The guaranteed maximum fee provides for all meetings specified in <br /> the Scope of Work The costs of additional meeting attendance would be on a time and <br /> materials basis if requested, such costs are not included within the guaranteed <br /> maximum fee Additional meeting costs are as follows <br /> o D&B $1,500-$5,000 (depending on scope) <br /> o CA $1,400-2,400 <br /> o UFS $1,600-2,400 <br /> o EPS $1,500 <br /> 2 Direct Costs. Direct costs (which are included in the budget) include printing, mailing, <br /> travel costs and related expenses All direct costs are billed at no mark-up Mileage is <br /> billed at the IRS-permitted maximum <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.