My WebLink
|
Help
|
About
|
Sign Out
07
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
111516
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 1:08:17 PM
Creation date
11/10/2016 11:02:17 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
11/15/2016
DESTRUCT DATE
15Y
DOCUMENT NO
07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Safety Official Protection of joints and penetrations in fire- resistive assemblies shall not <br /> be concealed from view until inspected and approved <br /> The Building and Safety Official shall require notification from the permit holder in order to <br /> make the following inspections <br /> 1 Foundation Inspection Footing and foundation inspections shall be made after <br /> excavations for footings are complete and any required reinforcing steel is in place <br /> Plumbing, mechanical or electrical components are required to be in place For <br /> concrete foundations, required forms shall be in place prior to inspection The <br /> foundation inspection shall include excavations for thickened slabs intended for the <br /> support of bearing walls, partitions, structural supports, or equipment Materials for <br /> the foundation shall be on the job, except where concrete is ready mixed in <br /> accordance with ASTM C 94, the concrete need not be on the job <br /> 2 Under-slab and Under-floor Inspection Concrete slab and under-floor inspections <br /> shall be made after in-slab or under-floor reinforcing steel and building service <br /> equipment, conduit, piping accessories and other ancillary equipment items are in <br /> place, but before any concrete is placed or floor sheathing or insulation installed, <br /> including the subfloor <br /> 3 Floodplain Inspection in designated flood hazard areas Upon placement of the <br /> lowest floor and prior to further vertical construction, a registered design professional <br /> shall prepare and submit documentation to the Building and Safety Official of the <br /> elevation of the lowest floor, including basement, as required in Section 1612 5 of <br /> the California Building Code, or for one-and two-family dwellings, Section R322 of <br /> the California Residential Code <br /> 4 Shear and Roof Inspection A lateral bracing, roof framing and sheathing inspection <br /> shall be made before any weather protection covering or roofing material is installed <br /> on the walls or roof of any building <br /> 5 Plumbing, Mechanical, Gas and Electrical Inspection Rough inspection of <br /> plumbing, mechanical, gas and electrical systems shall be made prior to covering or <br /> concealment, before fixtures or appliances are set or installed, and prior to framing <br /> inspection <br /> 6 Frame Inspection Framing inspections shall be made after the roof deck or <br /> sheathing are approved and the structure is adequately protected from weather <br /> intrusion, all framing, fireblocking and bracing are in place and pipes, chimneys and <br /> vents to be concealed are complete and the rough electrical, plumbing, heating, <br /> wiring, piping and ducts are approved Moisture content of framing members shall <br /> be verified in accordance with the California Green Building Standards Code <br /> 7 Sprinkler System Pre-Concealment Inspection Fire sprinklers shall be installed in <br /> all required locations, and the sprinkler piping installation shall be tested and <br /> inspected prior to the concealment of any sprinkler system piping <br /> 8 Energy Efficiency Inspections Inspections shall be made to determine compliance <br /> with Title 24, Part 6 and shall include, but not be limited to, inspections for envelope <br /> insulation R- and U-values, fenestration U-value, duct system R-value, and HVAC <br /> and water-heating equipment efficiency Wall and concealed ceiling insulation <br /> inspections are required to be made after the frame inspection is approved and <br /> before being covered <br />
The URL can be used to link to this page
Your browser does not support the video tag.