Laserfiche WebLink
this code, the technical codes or of other ordinances of the City of Pleasanton shall not be <br /> valid <br /> It shall be the duty of the permit applicant to cause the work to remain accessible and <br /> exposed for inspection purposes Neither the Building and Safety Official nor the City of <br /> Pleasanton shall be liable for expense entailed in the removal or replacement of any <br /> material required to allow inspection <br /> A survey of the lot may be required by the Building and Safety Official to verify that the <br /> structure is located in accordance with the approved plans <br /> Inspection Requests. It shall be the duty of the person doing the work authorized by a <br /> permit to notify the Building and Safety Official that such work is ready for inspection The <br /> Building and Safety Official may require that every request for inspection be filed at least <br /> one working day before such inspection is desired Such request may be made <br /> electronically, in writing or by telephone at the option of the Building and Safety Official It <br /> shall be the duty of the person requesting any inspections required either by this code or <br /> the technical codes to provide access to and means for inspection of the work <br /> In addition to scheduled inspections required herein, the Building and Safety Official may <br /> inspect any existing building or structure for cause within the City or when requested to do <br /> so by an owner or person acting under authority of the owner Such request shall be made <br /> in writing by the property owner, who may be required to submit evidence to indicate such <br /> authority A statement of all findings shall be sent to the owner and a record shall be kept <br /> on file in the office of the Building and Safety Official Applications shall be accompanied <br /> by an inspection fee established by resolution <br /> Inspection Approval Required. Work shall not be done beyond the point indicated in each <br /> successive inspection without first obtaining the approval of the Building and Safety Official <br /> The Building and Safety Official, upon notification, shall make the requested inspections <br /> and shall either indicate that that portion of the construction is satisfactory as completed or <br /> shall notify the permit holder or an agent of the permit holder wherein the same fails to <br /> comply with this code Any portions which do not comply shall be corrected and such <br /> portion shall not be covered or concealed until authorized by the Building and Safety <br /> Official <br /> There shall be a final inspection and approval by the Building and Safety Official of all <br /> buildings, structures, plumbing, mechanical and or electrical and on-site permits when <br /> completed and ready for occupancy and use <br /> Inspection Record Card. Work requiring a permit shall not be commenced until the permit <br /> holder or the agent of the permit holder shall have posted or otherwise made available an <br /> inspection record card such as to allow the Building and Safety Official conveniently to <br /> make the required entries thereon regarding inspection of the work This card shall be <br /> maintained available by the permit holder until final approval has been granted by the <br /> Building and Safety Official <br /> 20.04.340 Preliminary inspection. Before issuing a permit, the Building and Safety <br /> Official is authorized to examine or cause to be examined buildings, structures and sites <br /> for which an application has been filed <br /> 20.04.350 Required building inspections. Reinforcing steel or structural framework of <br /> any part of a building or structure or any plumbing, mechanical or electrical components <br /> shall not be covered or concealed without first obtaining the approval of the Building and <br />