My WebLink
|
Help
|
About
|
Sign Out
ORD 2149
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
11/8/2016 3:19:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/6/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2149
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
These requirements shall be printed on the construction plans to the satisfaction of the <br /> Director of Community Development <br /> 26 Rain gutters shall discharge into landscaping planter areas where feasible These details <br /> shall be shown on the plans submitted to the Building and Safety Division for plan check <br /> and are subject to the review and approval of the Director of Community Development prior <br /> to building permit issuance <br /> 27 The project shall comply with the State of California Model Water Efficient Landscape <br /> Ordinance and Bay Friendly Basics Landscape Checklist Prior to issuance of a Building <br /> Permit, the applicant shall submit the following documentation to the Planning Division <br /> a Landscape Documentation Package, which includes date, project applicant/contact <br /> information, project address, total landscape area, project type (new, rehabilitated, <br /> public, private, cemetery, homeowner-installed), water supply type (potable, recycled, <br /> well, greywater, combination of potable/greywater), and applicant signature/date with <br /> the statement that "I agree to comply with the requirements of the prescriptive <br /> compliance option of the Water Efficient Landscape Ordinance " <br /> b Landscape Plan documenting incorporation of compost at a rate of at least 4 cubic <br /> yards/1,000 square feet, compliance with the plant material criteria, compliance with <br /> the turf criteria, compliance with the irrigation system criteria, and installation of private <br /> sub-meters if the project is non-residential with a landscape area of 1,000 square feet <br /> or greater <br /> 28 The new homes shall be constructed to allow for future installation of a photovoltaic (PV) <br /> system and solar water heating systems The project applicant/developer shall comply with <br /> the following requirements for making the proposed residential units photovoltaic-ready and <br /> solar-water-heating-ready <br /> a Electrical conduit and cable pull strings shall be installed from the roof/attic area to the <br /> building's main electrical panels, <br /> b An area shall be provided near the electrical panel for the installation of an "inverter" <br /> required to convert the direct current output from the photovoltaic panels to alternating <br /> current, <br /> c Engineer the roof trusses to handle an additional load as determined by a structural <br /> engineer to accommodate the additional weight of a prototypical photovoltaic system <br /> beyond that anticipated for roofing, <br /> d Plumbing shall be installed for solar-water heating, and <br /> e Space shall be provided for a solar-water-heating tank <br /> Case No PUD-114, 11300 Dublin Canyon City Council <br /> Page 6 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.