My WebLink
|
Help
|
About
|
Sign Out
ORD 2149
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
11/8/2016 3:19:33 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
9/6/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2149
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 The applicant and/or developer shall submit a pad elevation certification prepared by a <br /> licensed land surveyor or registered civil engineer to the Chief Building Official and Director <br /> of Community Development certifying that the pad elevations and building locations <br /> (setbacks) are pursuant to the approved plans, prior to receiving a foundation inspection <br /> for the structures <br /> 24 All excess soil from the site shall be off-hauled from the site and disposed of in a lawful <br /> manner using a City approved haul route Unless otherwise approved by the Director of <br /> Community Development, no stockpiling of dirt on this site shall occur <br /> 25 The applicant shall implement the following construction best management practices to <br /> reduce construction noise, including <br /> a Locate stationary construction equipment as far from adjacent occupied buildings as <br /> possible <br /> b Select routes for movement of construction-related vehicles and equipment so that <br /> noise-sensitive areas, including residences and outdoor recreation areas, are avoided <br /> as much as possible Include these routes in materials submitted to the City of <br /> Pleasanton for approval prior to the issuance of building permits <br /> c All site improvements and construction activities shall be limited to the hours of <br /> 8 00 a m to 5 00 p m , Monday through Friday In addition, no construction shall be <br /> allowed on State and federal holidays, Saturdays, or Sundays The Community <br /> Development Director may allow earlier"start times"for specific construction activities <br /> (e g , concrete foundation/floor pouring), if it can be demonstrated to the satisfaction <br /> of the Community Development Director that the construction and construction traffic <br /> noise will not affect nearby residents Prior to construction, the hours of construction <br /> shall be posted on site <br /> d All construction equipment must meet State of California Department of Motor <br /> Vehicles (DMV) and City noise and air quality standards and shall be equipped with <br /> muffling devices <br /> e Designate a noise disturbance coordinator who will be responsible for responding to <br /> complaints about noise during construction The telephone number of the noise <br /> disturbance coordinator shall be conspicuously posted at the construction site and <br /> shall be provided to the City of Pleasanton Copies of the construction schedule shall <br /> also be posted at nearby noise sensitive areas <br /> f Construction activities conducted on the subject property shall not exceed 86 dBA at <br /> any point outside of the property plane of the subject property (Pleasanton Municipal <br /> Code Section 9 04 100 B ) <br /> Case No PUD-114, 11300 Dublin Canyon City Council <br /> Page 5 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.