My WebLink
|
Help
|
About
|
Sign Out
ORD 2151
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
10/11/2016 2:36:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
10/4/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2151
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a Landscape Documentation Package, which includes date, project <br /> applicant/contact information, project address, total landscape area, project <br /> type (new, rehabilitated, public, private, cemetery, homeowner-installed), <br /> water supply type (potable, recycled, well, greywater, combination of <br /> potable/greywater), and applicant signature/date with the statement that "I <br /> agree to comply with the requirements of the prescriptive compliance option <br /> of the Water Efficient Landscape Ordinance " <br /> b Landscape Plan documenting incorporation of compost at a rate of at least <br /> 4 cubic yards/1,000 square feet, compliance with the plant material criteria, <br /> compliance with the turf criteria, and compliance with the irrigation system <br /> criteria <br /> Green Building and Water Conservation <br /> 24 The current State of California's Green Building Standards Code, "CALGreen," shall <br /> apply, as applicable <br /> 25 All appliances and/or systems shall meet Energy Star standards The appliance(s) <br /> II or system(s) shall be stated on the plans submitted for issuance of a building permit <br /> 26 All new buildings shall be constructed to allow for future installation of a photovoltaic <br /> (PV) system and solar water heating systems The project applicant shall comply <br /> with the following requirements for making all new dwelling units photovoltaic-ready <br /> and solar-water-heating-ready <br /> a Electrical conduit and cable pull strings shall be installed from the roof/attic <br /> area to the building's main electrical panels, <br /> b An area shall be provided near the electrical panel for the installation of an <br /> "inverter" required to convert the direct current output from the photovoltaic <br /> panels to alternating current, <br /> c Engineer the roof trusses to handle an additional load as determined by a <br /> structural engineer to accommodate the additional weight of a prototypical <br /> photovoltaic system beyond that anticipated for roofing, <br /> d Plumbing shall be installed for solar-water heating, and <br /> e Space shall be provided for solar-water-heating tank <br /> These measures shall be shown on the building permit plan set submitted to the <br /> Director of Community Development for review and approval before issuance of the <br /> first building permit The project developer shall provide the future owners the <br /> necessary information delineating the means by which photovoltaic panels can be <br /> applied to the roofs of the structures covered by this approval This information shall <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 6 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.