My WebLink
|
Help
|
About
|
Sign Out
ORD 2151
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2101 - 2200
>
ORD 2151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2023 4:22:25 PM
Creation date
10/11/2016 2:36:54 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
10/4/2016
DESTRUCT DATE
PERMANENT
DOCUMENT NO
2151
Tags
Ordinance
Description:
Ordinance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
be submitted to the Director of Community Development for review and approval <br /> prior to the occupancy of the first unit <br /> 27 All water devices, such as faucets, toilets, shower fixtures, etc , shall be low-flow <br /> water conservation devices The water conservation devices shall be stated on <br /> the plans submitted for issuance of a building permit <br /> 28 This approval does not guarantee the availability of sufficient water capacity to <br /> serve the project Prior to the recordation of a Parcel Map, issuance of a grading <br /> permit, issuance of a building permit, or utility extension approval to the site, <br /> whichever is sooner, the applicant shall submit written verification from Zone 7 <br /> Water Agency or the City of Pleasanton's Utility Planning Division that water is <br /> available for the project To receive the verification, the applicant may need to <br /> offset the project's water demand <br /> 29 Prior to issuance of a building permit, the applicant shall pay the applicable Zone <br /> 7 and City connection fees and water meter cost for any water meters, including <br /> irrigation meters Additionally, the developer shall pay any applicable Dublin-San <br /> Ramon Services District (DSRSD) sewer permit fee <br /> 30 Only recycled water shall be used on the site during the grading and construction <br /> periods, and this specification shall be included on all grading plans and other <br /> construction documents <br /> Building and Construction Details <br /> 31 Details of the horizontal siding of the new townhomes shall be incorporated into the <br /> plans submitted to the Building and Safety Division for plan check and permits <br /> issuance and shall be subject to the review and approval of the Director of <br /> Community Development prior to issuance of building permits <br /> 32 The stucco for the townhomes shall be smooth and hand-troweled If the applicant <br /> can demonstrate to the satisfaction of the Director of Community Development that <br /> the appearance of hand-troweled stucco can achieved mechanically, mechanical <br /> application of the stucco is allowed Prior to issuance of a building permit, the <br /> applicant shall submit a finished stucco sample for the buildings The stucco sample <br /> shall be subject to the review and approval of the Director of Community <br /> Development prior to application/installation on the buildings <br /> 33 Wood-, fiberglass-, or vinyl-framed/sashed windows shall be utilized on the <br /> structures If fiberglass- or vinyl-framed/sashed windows are used, they shall have <br /> a similar frame and sash thickness as found on a traditional wood-framed/sashed <br /> window unless the required noise mitigation for this project prevents compliance <br /> with this requirement In addition, simulated mullions must appear real and be on <br /> both sides of the glass Windows of new structures shall be recessed two inches <br /> from the outside face of wall with wood sills No reflective glass is allowed The <br /> window glazing shall be clear with no tint Manufacturer's specification sheets, <br /> P16-1201, P16-1202 & PUD-120, Catalyst Development City Council <br /> Page 7 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.