My WebLink
|
Help
|
About
|
Sign Out
GHAD
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
100416
>
GHAD
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2016 10:05:17 AM
Creation date
9/30/2016 10:04:38 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/4/2016
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- -- Expect Excellence <br />GEOTECHNICAL <br />ENVIRONMENTAL <br />WATER RESOURCES <br />CONSTRUCTION SERVICES <br />PREFERRED CLIENT FEE SCHEDULE <br />PROFESSIONAL SERVICES <br />Effective April 2016 <br />President $305.00 per hour <br />Principal Engineer /Geologist $250.00 per hour <br />Associate Engineer /Geologist $225.00 per hour <br />Senior Engineer /Geologist $200.00 per hour <br />Project Engineer /Geologist/Manager $180.00 per hour <br />Environmental Scientist $175.00 per hour <br />Staff Engineer /Geologist $160.00 per hour <br />Assistant Engineer $135.00 per hour <br />Construction Services Manager $158.00 per hour <br />Senior Field Representative II $143.00 per hour* / ** <br />Senior Field Representative I $12800 per hour* / ** <br />Field Representative $118.00 per hour*/** <br />Environmental Technician $125.00 per hour*/** <br />Senior Laboratory Technician $145.00 per hour <br />Laboratory Technician $130.00 per hour <br />CAD /GIS Specialist $128.00 per hour <br />Network Administrator $195.00 per hour <br />Project Assistant $113.00 per hour <br />* Two -hour minimum portal to portal. Travel time, pick -up and delivery will be billed based on normal hourly rates, portal to portal. <br />* OVERTIME RATES: Rates increased by factor of 1.5 for all hours worked in excess of eight (8) Monday through Friday, and the first <br />eight (8) hours worked on Saturday. Rates increased by factor of 2.0 for all hours worked in excess of twelve (12) Monday through Friday, <br />all hours worked in excess of eight (8) on Saturday and all hours worked on Sunday and holidays. <br />** For Prevailing Wage projects, increase the hourly rate by $15. <br />** Rates increased by factor of 1.25 for night shift hours (hours commencing after 4:00 p.m. or before 4 :00 a.m.); rates increased by factor of <br />1.875 (an additional factor of 13) for all night shift hours in excess of eight (8). <br />ADDITIONAL SERVICES OFFERED <br />In addition to our core services of geoteclmical, hydrologic and environmental engineering, invading cow -phase testing and <br />observation, ENGEO provides clients with services for establishment and management of Geologic Hazard Abatement Districts (GHAD) and <br />for Entitlement and Permitting Support (EPS). For more information about these services and associated pricing, please contact ENGEO at <br />(925) 866 -9000. <br />OTHER FEES <br />o Equipment and materials will be charged in addition to the above hourly rates. <br />o Outside Consultants, Subcontracted Services and Equipment Rental ...... .. _ _.__C plus 20% <br />• Deposition, Mediation, Arbitration, or Court Appearance (11fininum Charge) _.$2,000.00 half day, $4,000.00 full day <br />TERMS <br />hrvoices will be submitted at completion of work or at approximately four week intervals and are due and payable upon receipt its <br />will be issued at monthly intervals Charges not paid within 30 days of invoice date will accrue a late cue at a rate of 13 percent per month. <br />In the event it becomes necessary to commence suit to collect amount due, Client agrees to pay attorneys fees and costs, as the court may deers <br />reasonable until amount is paid. Fees well be applicable for one year from the effective date above; theme, fats will he adjusted annually. <br />Our fees will be blued using an invoice format produced by a standardaed accounting software package. A name customized itemization of <br />charges and backup data will be provided upon Client's requests, but at additional fees Final reports may be withheld until outstanding <br />invoices are paid in full. <br />Many risks potentially affect ENGEO by virtue of entering into this agreement to petfarm services an behalf of client. A principal risk is the <br />potential for lnmean Error by ENGEO. For client to obtain the benefit of a fee that includes a nominal aloe for dealing with our liability, <br />client agree to limit ms's liability to Client and all other patties fir clangs arising out of care performance of the services des ilaed in the <br />The aggregete liability will not weed 850,000 (or ENGEA's fee, whichever is greater, but not more thin $1,000,000) for <br />professional acts, Ceara, or omissions, including attorney's fees and cis that may be awarded to the prevailing party and client agrees to <br />indemnify acrd hold harmless ENGEO firm and age all liabilities in excess of the teary limit : a : ,, a <br />April t, 2016 <br />ww w.edgem_eatum <br />
The URL can be used to link to this page
Your browser does not support the video tag.