My WebLink
|
Help
|
About
|
Sign Out
22
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2016
>
100416
>
22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2016 2:23:44 PM
Creation date
9/29/2016 2:50:37 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
10/4/2016
DESTRUCT DATE
15Y
DOCUMENT NO
21
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
made at other times to make up for the annual shortfall." The cost of managing excess <br /> renewable energy supply could be reduced through the use of unbundled RECs. For example, in <br /> hours when the CCA is long on renewable energy, it could simply resell the energy in the spot <br /> market and keep the REC rather than selling the bundled REC at a discount in one hour when it <br /> has excess supply and purchasing a bundled REC in another hour. <br /> Non-Renewable Energy Cost Forecast <br /> MRW separated the costs of non-renewable energy generation into two components: power <br /> production costs and greenhouse gas costs. The forecast methodologies for these cost elements, <br /> described below, are consistent with the forecast methodologies used for these cost elements in <br /> the PG&E rate forecast. <br /> Since natural gas generation is typically on the margin in the California wholesale power market, <br /> power production costs for market power are driven by the price for natural gas. MRW <br /> forecasted natural gas prices based on current NYMEX market futures prices for natural gas, <br /> projected long-term natural gas prices in the EIA's 2015 Annual Energy Outlook,12 and PG&E's <br /> tariffed natural gas transportation rates.13 MRW used a standard methodology of multiplying the <br /> natural gas price by the expected heat rate for a gas-fired unit and adding in variable operations <br /> and maintenance costs to calculate total power production costs. <br /> In addition to power production costs, the cost of energy generated in or delivered to California <br /> also includes the cost of greenhouse gas allowances that, per the state's cap-and-trade program, <br /> must be procured to cover the greenhouse gases emitted by the energy generation. MRW <br /> developed a forecast of the prices for these allowances based on the results of the California Air <br /> Resources Board's (ARB's)auctions for Vintage 2015 allowances,i4 increased annually in <br /> proportion to the auction floor price increases stipulated by the ARB's cap-and-trade <br /> regulation.15 MRW estimated the emissions rate of Alameda CCA non-renewable power supply <br /> based on an estimated heat rate for market power multiplied by the emissions factor for natural <br /> gas combustion.16 <br /> Capacity Cost Forecast for Non-Renewable Power <br /> 11 This is because it is likely that other potential buyers of renewable energy at times when Alameda has excess <br /> supply will also have lower need for additional renewable energy. <br /> 12 U.S. Energy Information Administration."2015 Annual Energy Outlook,"Table 13. <br /> 13 Pacific Gas&Electric,Burnertip Transporation Charges.Tariff G-EG,Advice Letter 3664-G,January 2016 and <br /> Tariff G-SUR,Advice Letter 3699-G,April 2016. <br /> 14 Auction results available at http://www.arb.ca.gov/cc/capandtrade/auction/results summary.pdf. <br /> 15 California Code of Regulations,Title 17,Article 5,Section 95911. <br /> 16 U.S.EIA.Electric Power Annual(EPA),February 16,2016,Table A.3. <br /> https://www.eia.gov/electricity/annual/html/epa_a_03.html <br /> July,2016 B-4 MRW&Associates,LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.